The Continuation...

Friday night, the stomach bug hit me and I suffered, hard, for the next 10 or so hours. Saturday morning, I awoke in absolute agony and exhaustion. Cats meowing. Kid crying. I could barely do anything without sitting down to rest for a few minutes in between each small action. Despite my mom, who came over to let me rest for a while, it was a difficult and trying day. Mike was late coming home, buying a guitar. I was spent.

Sunday morning I felt much better, rested, and hungry. Good sign. I ate a normal breakfast. Suddenly, it was back to business as usual. Our neighbor was over around 10am and he and Mike completed the painting in the kitchen. Then, Mike was on his own. He put the window trim back on. He nailed down some plywood to match the thickness of the tile where there had previously not been tile. He was mauled by a falling cactus. (Don’t try and catch your cactus.) And Sunday ended.

The only small bit of work that remains in the kitchen is the relocation of two pipes – heat for the upstairs. It should not be a problem. Tomorrow, I’ve got to get on the phone with the kitchen guy and the production people to try and coordinate this installation. Apparently, it’s going to take longer then I imagined. I was thinking just a full day of work to get these things up and set… But maybe I’m the crazy one for thinking such a thing.

It’s been a full official week now and one of the worst I’ve had in a while. Here’s to good times ahead – I know they’re just on the horizon. Just have to get there.

Hanging In There

This will go down on record as possibly the craziest and most uncomfortable week ever. Lack of kitchen, yeah, I can deal with that. Been there, done that, know the drill. But not with all this!

Monday: Mike finished hanging all the drywall. Two or our neighbors came over and did some taping that night.




Tuesday: I had my ultrasound and found out, It's a Girl! (The pre-anticipation and post-mental overload have left me in a state of numbness all week.) Tuesday night, the neighbors were back for more taping and mudding.




Wednesday: Was a day of rest for the guys, but I still had to do a bunch of driving in terrible weather, which is always stressful.

Thursday: Cabinet arrival day! I rushed home around 12:30 to meet the delivery dudes... who delivered an incredible amount of boxes, filling the entire mudroom and living room. (As if they weren't already stuffed enough.) I opened one of the boxes after the left... the cabinets are even more beautiful then I had envisioned. And then I rushed back to work only to just barely sit down at my desk when - RING RING! Mikey's school. He was sick with the stomach flu. I had to get back in the car and go all the way back past home to pick him up and then back home... and try to take care of him in a living room full of boxes!




I was exhausted by 6pm, which was the exact time the neighbors knocked on the door. They did the pea coat and sanding with Mike Thursday night. Once that dried, it would be ready for primer and paint.




Mike cleaned up after they left and we both collapsed into bed around 10.... at which time, Mikey threw up again... in bed.... soaking everything. He had to sleep with us. (And we do not sleep well with him - he kicks and punches and rolls around like a mad man.)

He did not throw up again, but Mike and I were still exhausted when we woke up Friday morning.

Friday: Mike stayed home with Mikey, as he could not go back to school within 48hrs of the bug. Our neighbor had the day off too and the two of them primed... and then painted the kitchen. I was in disbelief when I got the pictures via text. I didn't think we'd have enough wall paint... and I was pretty sure the small remainder of the ceiling paint was unusable.

Meanwhile, I tried to coordinate cabinet installation for this upcoming Monday, (what with the amazing progress) but the production crew was unavailable. We'll have to shoot for (haha) Monday the 12th. Hopefully at least we'll be able to move the boxes into the kitchen until then. The stove and the dishwasher are both hooked up. The biggest pain now is all the boxes.

Jumping in the Kitchen Headfirst

As name implies – there’s no going back. We’re kitchen committed now. Mike… my poor guy. He’s going to need a serious break after all this.

Let’s roll the clock back to Saturday AM. My monumental task of the day is a mission of epic proportions. The entire kitchen needs to be emptied. The contents of the entire kitchen cannot be in the kitchen. Dangerous, sharp, and spillable/breakable items cannot be within the reach of our 2.9 year old. The entire house needs to be meticulously cleaned. The entire kitchen needs to be meticulously cleaned. Why? Well, here’s a portion of the big kitchen secret. It’s all being filmed.

I can’t divulge more then that at this time, but, very HGTV-like, we needed to prepare a proper “before” shot. Clean, clutter free, but still appearing as though someone really truly uses this kitchen. (Can’t clean the counters completely, can’t remove pictures from the wall or plants from the window sill.)

It took the entire day. Literally, the entire day, to do this. First, I cleaned areas not the kitchen. Bathroom, mudroom, living room. Did the dishes. Did the laundry. Made a quiche. Started marinating a pulled pork to put in the crock pot Sunday AM. (Preparing for a difficult-to-cook situation. Can you tell I’m an old pro at this??!)

Once that was accomplished, it was on to the kitchen. I started with the clutter. The stuff on the fridge, off. The pens/pencils, vitamins, and other junk on the counter, off. Then, time for the cabinets. I took a deep breath and went through them one by one, stuffing stuff wherever stuff could be stuffed. I threw out some things. I brought some other things to the basement for storage. Discovered I had at least 10 Coors Light cooler bags. (No new cooler bags this summer!) And slowly, all the cabinets were emptied.

There’s stuff on the piano. There’s stuff under the piano.There’s stuff on the wall of the mudroom where I removed Mikey’s easel and our shoes. The glasses and tupperware are in the laundry basket, in the laundry closet.


There’s stuff on top of the kegerator. 


There’s stuff on the living room shelf thing – and on top of it.


There’s stuff on top of the entertainment center. Plates and bowls are in one end table. Pans are under the couch.  



There’s stuff in and on the bar.
 


There’s fondue pots in the hallway. I felt like some sort of super-organized hoarder. Stuff, stuff, and more stuff everywhere. And yet the house was still clean.






I discovered the original yard sale price tag from when we purchased our current cabinets. $200 for the whole set w/sink. We didn’t take the sink. Either that or we took it and threw it out.

Without much time to reminisce, I continued on. Once the kitchen had been emptied, it had to be cleaned. I was exhausted, but cleaned and tidied what I could before calling it a night… because that’s what it was at that point. Night.

Sunday morning, we were all up early. After breakfast, Mike got out the buffer (yes, an automotive buffer) and cleaned the stove and all our stainless steel. (Refrigerator, stove, and dishwasher.) And if you think cleaning your stove with a buffer is crazy… well, you should see what an awesome job it does. Just put a little glass cooktop cleaner on there and have at it. (Make sure you’ve wiped the surface free of all crumbs, etc first – else you could scratch your cooktop.) Meanwhile, I tidied up more, cleaned more, vacuumed, and swiffered. 

In a groundbreaking first-time-ever event, we were finished before the film crew arrived. (Usually never finished on start time – whether it’s a party or any event.) Then, for the next hour or so we did all our “befores” and even took down a few cabinets for show. It all went surprisingly smoothly and the crew was out and on their way on time, leaving us to do the rest on our own.

Everything went very well at first. The tops all came down no probs. There was a little mildew on the upper wall by the stove. Ok. No sign for alarm yet. The bottom on one side of the stove, no probs. Sink – pain in the butt, but not really a problem. After everything was disconnected, it wouldn’t come out. We had to use a sazall to cut the countertop around it off. Dishwasher unhooked with no problem. Shelf demo was fun and exciting.




Then we got to the rest of the cabinets on the back wall, on the left side of the stove. Problem. The cabinet right next to the stove pretty much fell apart as it was taken out. As in, all the sides collapsed. Why? Water damage. Behind the damaged cabinet, more bad news. Moist and spongy drywall. (Three words you never want to hear together in the same sentence.) Behind the moist and spongy drywall, yucky insulation. More bad news. Prognosis: the ceiling is leaking down the wall. How do we know? We can see the trail of cracked paint on the ceiling and now moist & spongy drywall, yucky insulation, and a damaged cabinet on the wall. Treatment: immediate removal of grossness and immediate emergency roofing.

Cracks in ceiling paint - mildew on upper part of wall

Potion of no drywall = bad. See that blackness on the insulation?


First, of course, we finished removing the cabinets and countertop and hauled them all away. Then, we ripped out the entire kitchen back wall. Drywall and insulation. Mike examined the sill and the studs for water damage and luckily, everything looked good. He spent the rest of the afternoon on wiring, since the new layout moves the stove over and incorporates a microwave on top. (A couple outlets needed to be moved… and we had an extra wire in there already, having planned for possible future stove-vent wiring. Smart, huh?) I spent the rest of my afternoon doing what else – cleaning up.

Hope future generations appreciate my insanity




So, changes in the wiring + no outlets in stock = no stove. Smart again with the dinner in the crock pot! The refridge is of course on its own breaker, no problems there. We did however have insulation in stock, extra from the basement bathroom. Most of that went up Sunday night before we called it quits.

We also put a call into our roofer/builder, Timmy. He did our entire other roof – everything but the kitchen, which we held off on at that time. He also did much of the finish work on our farmer’s porch. And let me say, he’s a great resource for questions or advice in either of those fields. Bruins fan – great guy. Another asset to the neighborhood. Anyhoo, Mike briefed him on the situation and they agreed that a rubber roof was the only way to go on a poorly sloped roof like our kitchen’s. Problem – you can’t rubber roof in temps under 50 degrees. But, and this is good prep for a new rubber roof anyway, he advised us to ice & water the entire thing. That should hold us off until spring.

Now, it’s the end of Sunday night. There’s stuff everywhere. There’s tools and building materials everywhere. The stove is off. The drywall is down and insulation is up. The truck is full of demo. In prep for the new kitchen, we had not planned on replacing any drywall. We had only planned for fixing cracks along the adjacent wall and re-painting. (No paint behind old cabinets.) We had certainly not planned on a new roof! The wiring, we knew about, and that was relatively easy. There are two pipes for the upstairs heat that need to be re-routed that we had forgotten about. Kitchen sink plumbing can come after the fact, thank god.

And the new cabinets are coming – this Thursday! Gulp. Everything must be completed by this weekend.

I Like to Tape It, Tape It, Mud It, Mud It

As promised, all the taping was completed on Tuesday night. I could hardly believe it. The guys worked from 6:30pm – 8:30pm and finished all the taping.



Wednesday, Mike picked up some corner beads and masking tape on his way home. Then, from about 6:30pm – 8:00pm, he and our neighbor finished installing and mudding all the corners. And, they did all the mudding and whatnot around the tub/shower. (That’s what the masking tape was for.)

I could hardly believe it. It’s looking awesome. Incredibly awesome. Incredibly fast. (This is what happens when you work with a professional.)

The two of them will be back at it tonight and probably Friday night. And that’s it. Paint-ready.

Full Speed Ahead

On most of these holiday Mondays, I feel like I’m the only one working. Yup, no three day weekend this Presidents Day. But while I was sitting at my desk, Mike continued to make progress at home, hanging more drywall. He even did some mudding in the closet.

He asked me to pickup some drywall tape on the way home, which I did. And when I arrived, I was surprised to find our neighbor pulling in almost right behind me. The two of them did some taping in the closet and then Mike continued on by himself for the rest of the evening.

I joined him after Mikey’s bedtime and we finished hanging the drywall. 100% complete.




Our neighbor will be over again tonight after work… He thinks he can have the entire room taped within an evening. A couple more days of mudding and sanding after that and we could be painting by this weekend. This, I did not expect. And I doubt we’ll have time to be painting this weekend, but you never know. Saturday night is a possibility…

It's Not Easy Being Green Drywall

The madness of the next four weeks began on Saturday, and I don’t expect it to slow down until at least 3/11. Saturday morning the electrician arrived and completed all our wiring in under an hour and a half. The recesssed lights, the outlets, the switches – everything – all set.



Sunday was outrageously insane. Immediately following breakfast, Mike called over our drywall’n neighbor to help him measure and determine the right amount of drywall sheets. Before 10am, the whole family was packed in the truck for the weekly trip to our favorite orange-themed home improvement warehouse.

This, we have down to a science.

Upon entry, we split up – Mike with the big cart, heading for drywall, and Mikey and I in the racecar cart headed towards electrical. While Mike got the drywall, screws, mud, and insulation, Mikey and I made a return, picked up plastic sheeting, a 2’ closet light, and a pancake box for the vanity light. We were even lucky enough to score a free two-person plastic kids sled at customer service. (I guess they don’t expect to sell them this winter.)

We all met back up at the register, having coordinated our shopping list across the store via our cell phones. Immediately I asked, “Where’s the drywall?” There was none on the cart. Then I saw the forklift… with half a pallet – 20 sheets of the mold resistant green stuff. Boy, did that add up. 20 sheets plus 2 buckets of mud plus 3 packs of R15 plus drywall screws, plus all the stuff in our racecar cart. To the tune of over $500.

Didn’t matter – we were on an orange-plastic funded mission. And we loaded up everything and headed for home. Our neighbor pulled in to our driveway right after we arrived. He and Mike unloaded a few things and got right to work.

The first challenge was the vent for the fan. Mike had the distinct pleasure of drilling through over 10” of solid PT to get a hole from the inside of the basement to the outside, at the bottom of the porch. (Think a thick sill plus thick farmer’s porch construction.) His hole saw couldn’t even make it all the way from one side. He had to go outside and drill from the opposite direction.


 By the time that was done, two of our other neighbors arrived and helped bring down all the drywall. Then, they took a break to walk around and mark the property borders using all their resources – online maps, printed maps, a super long tape measure, and a can of orange marker paint. Then they made some clams casino. Then, I was sent on a beer run.

(You keeping up with all this?) Just a day in the life here in this neighborhood.

They all headed back downstairs after “lunch,” built a small soffet over the sink area to hide a pipe that just couldn’t have gone anywhere else, and then cut and hung all the ceiling drywall. All the neighbors left after the ceiling was up, but Mike and I pressed on.



I finished the insulation as Mike continued to hang drywall. He and I both put up the plastic sheeting over the insulation, an extra moisture barrier layer, and then Mike went back to hanging.

After Mikey and I had dinner, and after Mikey was in bed, Mike was still hanging. I rejoined him to clean up and we called it a night with over 75% of the room finished.




Next step, of course, da mud. But that may have to wait. Next Saturday begins kitchen demo madness. I have to first empty everything from all the cabinets and prepare the room for demo. Sunday, demo.

For the week following, we’ll be in a rush to finish the drywall, paint, and small amount of electrical in prep for the arrival of the new cabinets.

Dam It Jim I'm an Editor, Not An Electrician

Mike did not call our electrician last week as promised. Over the week, he’s been installing boxes and doing some initial wiring… and had somehow by Sunday he had convinced himself that he could do it all by himself. All by himself with a little help from the internet. I said nothing until he started asking me questions about GFI’s. Me?

If it’s come down to I’m-The-Most-Knowledgeable-Person-In-The-Room about electrical… well, I think it’s time to call in a professional. Mike actually agreed. He made the call and scheduled for next weekend. (Almost too easy.)

And me? I’ve got to call on cabinet delivery dates as soon as I remember to grab the number. I’m thinking electrical this weekend – kitchen demo next weekend. That would leave us 1-2 weeks to do drywall and all other previously listed changes. Speaking of drywall, we’ll be ready for that downstairs too once the electrical is complete.

HOLY CRAP THIS IS ALL COMING TOGETHER! My Bday’s March 9th… I think I’m going to have a party.

Style of Cabinets - Color Isn't Very Accurate Here

Color is More Accurate Here, A Little Lighter - Swatch is Countertop

Kitchens and Bathrooms

It’s happening… the kitchen. It’s happening. Again, I can’t go into how or why, but I can tell you that the cabinets have been ordered and they’ll be arriving in 4 weeks. Current kitchen demolition begins in probably 2 weeks. I am literally beside myself.

The cabinets are beautiful – all wood, real wood, in a beautiful redish maple color. The hardware is hidden, the drawers pull all the way out, and the lazy susan is real wood too! Plus, all hardware, a pull-out trash can cabinet, and a cutlery divider were all included. Our kitchen design will change slightly, as the stove will move over to the left. We’ll have a new microwave-holding cabinet above the stove that can also accommodate a vent if we decided to get one. (New microwave and vent not included, but I’m sure we’ll find a way to add them before summer arrives.) We’ll have a new corner cabinet that abuts the refriderator – YES! Plus, two additional cabinets above that new corner cabinet. (Which originally I didn’t want, but they were also included with this special package deal… couldn’t resist.) Also, at the end of the dishwasher, where we currently have an oddly built shelf, we’ll have a cabinet.

And did I mention new countertops?! Not granite. More laminate. But they’ll be custom made and seamless. They’ll be light in color too – a change from the grey/black ones I’ve always loved. But I was talked into a light color and I’m really digging how it looks next to the cabinets. It coordinates well with the floor, which I hope isn’t too matchy-matchy. I usually prefer contrasting colors. But as I said, I was talked into it and feel good about it now.

So, what’s on the kitchen to do list in t-minus 2 weeks?
            Remove old cabinets, everything in them, and everything else in the kitchen
            Disconnect sink and dishwasher
            Fix and repaint all drywall (Except for the back wall, which we did last fall.)
            Temporarily remove one portion of the track light
            Move stove electrical to the left
            Move current outlet in stove’s way to the right
            Wire for new microwave/vent

We’ve decided not to re-tile under the cabinets. It’s just a pain in the butt and we don’t know if we have enough tile anyway. If we need to, we’ll use plywood to help level the non-tile cabinets with the tile cabinets.

Oh, and did I mention, we’re not the ones installing? Music to Mike’s ears. The first set of cabinets was such a royal pain that I promised him if we ever re-did the kitchen, I wouldn’t make him put the cabinets in.

There you have it. The countdown is officially on. I still can’t believe this is happening. Maybe I’ll wake up from it all tomorrow and be back in time to when we had no cabinets in the kitchen at all…

And the bathroom? Over the weekend I purchased ALL the electrical… or at least all I could think of. I bought a vent, one with high fan power, low noise, light, and night light. I bought a vanity light – modern design, nickle finish. I bought three Halo recessed light air-tight housings, two eyeballl trims, and one waterproof shower trim. I bought a dimmer switch. I bought lightbulbs for said Halo recessed lights. Dang it – I just realized. I forgot the closet light. Oh well. I bought a lot because I wanted to make sure I was over $299 to get 0% financing…. I made it! OVER $400 for all that.

Forgetting the extreme cost for a moment and returning to progress… Mike has already nailed up the recessed light housings and plumbed the vent. I keep reminding him to call our electrician, but I don’t think he’s done that yet. That will be next on the agenda. Once the electrical is complete, it’s insulation and drywall time.



Did I mention I picked out the paint color over the weekend too? It’s going to be perfect… with the tile… I can’t wait to see them together at last.

The Night Shift

Progress! Progress on a Wednesday, Thursday, and Friday at that. Progress in the evenings at that. Progress.

Wednesday night, Mike framed out the bathroom closet. It's going to be a good size - which is good, since we shop at BJ's.



Thursday night, the plumber was over and he and Mike did EVERYTHING. They finished the tub plumbing, put the tub in its place, and tested the entire system. No leaks! (First time for everything, right?) Mike even began cleaning up after the plumber left... but didn't get too far, since our shop vac's filter was plugged to the max. (Dang you Sears - the only place you can purchase your Crapsman Shop Vac Filter.)



Then, just this afternoon, I got a surprise call from Lowes! The tile is in... Early! What a nice end to the week. I picked it up on the way home and I am psyched! Mike picked up his filter and he is psyched! Ok, so maybe not, but it's still reason to celebrate, in my opinion.

Next step - electrical. Mike's bringing in a pro to help with this too - just to keep things safe with all the GFI's and such. Never can be too careful around water. But it shouldn't be a big to-do. A few lights, a fan, some switches, an outlet or two here and there... Done! Stay tuned...

And now for the other big news of the week. Big BIG news. The possible kitchen I alluded to in a previous post? It's happening! It's really really for really real happening. I can't share too many details, since this kitchen is a semi-covert operation. But I will tell you that we had a dude come out and measure. He drew out and planned a new design for us and found a great, economical cabinet manufacturer for us. I went and looked at everything - loved everything - and the order will be finalized on Monday.

There's only a little bit of stressful news to accompany all this good stuff... in prep for cabinet installation, there's a lot to do in very little time while we have a lot of other bathroom-related tasks going on. Of course all the old cabinets must be removed. Drywall needs to be fixed on walls and ceiling and repainted. No tile existed under the current cabinets - so we will need to add tile. The stove is moving over - hopefully the wire will reach.

Sometimes I wonder if all this is really happening....

A Tub In Time

Mike is a highly distractable dude. We've talked about this before... you know, the whole, "No New Projects Until Unfinished Projects Have Been Completed" policy that I try to keep in effect? This weekend, his goal was to put in the tub. Unfortunately, he got stuck on Sunday... he wasn't 100% confident on putting in the drain and had a slew of questions. He called our plumber friend who promised he'd try and come out some time this week.

But, with plenty of other tasks to be accomplished, Mike continued on, purchasing more lumber & doors for the closet and additional plumbing parts. And that brought Sunday to a close, since we had a dinner/tax date in the evening.

So, with all this to do downstairs, plus hooking up our new car stereos, plus hooking up our new Wii, plus a whole lot of other projects I shouldn't even mention.... what the hay - the new furnace filter, the Jeep go-cart project, cleaning the carpet/couch with the upholstery machine we brought home like 3 or 4 weeks ago... ok, I'll stop there. So, with all that, I was shocked to hear that he borrowed a metal detector on Monday and was gallivanting around the yard searching for our property markers.

Really? As I said, highly distractable. His reasoning was the putting up for sale of the house next door, who uses a portion of our property for their driveway. We don't mind that they use the land - we're just not giving it up. Still I ask, really? The house just went on the market and I'm guessing it will take some time to sell, just like last time.

And he didn't even find the markers he was looking for. The detector at one point beeped "GOLD" so he got down and dug... beer can. I reminded him again how useless I thought a metal detector was in our yard. For years, previous owners had buried their trash. (That's just what they did in the olden days.) So there's a ton of junk underground. We've found car parts, dishes, bottles, cans, and plenty of other worthless junk in the ground out there - simply by accident, or by digging.


Sometimes, you just can't argue with guys. I'm just hoping our plumber can visit us soon so this weekend doesn't turn into a scavenger hunt to nowhere too.

Is There Bathroom Yet?

Would you believe after our disappointing run to the HD, Mike went to begin plumbing and discovered that we’d purchased the wrong gauge of pipe? A fitting end to a trip fated for disaster.



But it all ended well, since on the same trip to return the pipe, Mike returned a bunch of lattice connectors (leftover from summer farmer’s porch work) that we didn’t need.



*And let me take a time out here because I had to FORCE him to take this stuff back. What is up with guys and returning stuff? Sure it’s been months. Sure we don’t have the receipt. But they’re Home Depot! Unless you’ve cut it, drilled it, or damaged it in some obvious way – they will take it back! But did he want to take it back? Noooooo. Not without me. I said, “Fine, I’ll go.” Then, the reply was, “But I’ll have to put away all the stuff in the garage…[that was littered about the driveway]” So I said, “Ok, then I won’t – but you’re going to take it back! I would do it myself, but it won’t fit in my truck.” He grudgingly loaded it up… And came back with nearly $50 in store credit from the lattice connectors alone! ($40 additional in cash from the pipe, which he’d had the receipt for.)



$50 that would have been otherwise just sitting in the basement until it was damaged and needed to be thrown away. GUYS! And by the way, I have embarrased myself plenty of times trying to bring stuff back that was cut, drilled, and/or damaged in an obvious way. So what? It’s worth the try every time.



Going back to the bathroom – Mike then purchased the pipe at his work for a better price. Boo-yah, meant to be. He’s been plumbing all week after a flair up of eczema on my face got us both back thinking about the ill health effects of that dang old bathroom.




And as for the tile? My sweet sweet sweet tile. I asked Mike to measure and give me the amount of tiles we needed. (12x12 makes it simple – one square foot each.) The grand total: 120 tiles, and of course we’d need extra. No problemo. I hop back onto Lowes.com, find my tile, put the price into my caculator and…. HAD A FREAKIN HEART ATTACK.



A box o tile contains 11 tiles. A box o tile costs about $58. I estimated we’d want to get at least 13 boxes. THAT’S OVER $700!!!!! Plus tax, thanks Massachusetts.



I was so flabbergasted.  I thought about it for over a week, looked at other tile on other websites, and even visited Lowes the store. $58 for 11 was a comparable price. Plus, I didn’t like anything else I saw anywhere else. There’s just not much choice in the Blue color scheme. Much of it was 12x12 squares made up of itty bitty mosaic tiles. No thanks.



I thought about it. Thought about it. Then last night, Mike gave me the news… he was going to be finishing up the plumbing. The closet would need to be built – a fairly easy task. And then the tile. That was just the next step.



I had to make a decision and I bought it. My plastic is still steamy hot from the transaction. Ugh. Who would have thought the flooring would have been nearly as expensive as all the fixtures?



It will be delivered to the store 2/8. Almost makes me wish I had ordered it a week ago, but no matter. Plenty of time to finish up the plumbing, closet, and tie up any other lose ends.



And we may be getting a brand new kitchen… yes. Maybe.

DeepHo Lack of Anything

With the beginning of a new week, Mike and I were all fired up to get back on track and back downstairs a-workin. But, first thing was first. We needed more materials! So Mike made a list on Monday and we packed up the fam and headed off to the Home Depot around 6:30pm.

Upon our arrival, we decided to pick out the tile first. They had NOTHING. And I mean NOTHING besides gross, ugly, mundane, monochromatic, or cheeseball. I couldn't believe it. No brilliant colors whatsoever (besides black - cheeseball) and no aesthetically pleasing textures or designs. It was all these boring earthtones - brown, brown, lighter brown, greenish brown, etc etc. They reminded me of tile you'd find in the bathroom at your local Casual Family Dining Establishment Chain. Ew and gross. No.

What I'm looking for is a brilliantly interestingly textured dark blue (like the deepest depths of the ocean and you get lost at sea just looking into it) tile. Big tiles - 12x12. Here's ones I like from Lowes: Awesome Tile This will be in stark contrast to the walls, which will be a light (but still "deep" if you know what I mean) grey. Think of that same day on the middle of the ocean... the sky covered in clouds - but not storm clouds. Peaceful, quiet grey... no harsh sun beating down on you. You're all with me on my design vision here now, right? The white tub and toilet, brushed nickle fixtures, and dark wood trim and vanity hint at a nautical feel without putting stupid boats and life preservers on the wall. Because I'm not "beachy," despite being a native Cape Codder, and I'm not "boaty" either. In fact, I have an aversion to either theme and all the related items sold at Christmas Tree Shops.

Long story already made long, we left the flooring department empty handed. I'll go to Lowes, where the tile selection is so much better. (This is where I purchased my mudroom tile.)

Next stop - plumbing, for all the copper piping and fittings. Only one problem. Hardly ANY copper pipes. And I mean there were like 5 for each size category. I'm not exaggerating. We picked them dry of the category we needed, (with 5) leaving a warped 6th pipe on the shelf. It was the most ridiculous thing I'd ever seen, especially since all the other shelves of PVC were stocked full. As you can imagine, this did not satisfy our list. Mike picked out all the fittings he could, but still couldn't find many of the other things on his list.

Mikey and I left him for a bit to pick out a fan/light fixture in the next aisle. (Didn't quite plan on it, but sometimes I don't get to go on these DeepHo trips. May as well pick out what I want while I'm here. Plus, we wanted to get up to $299 to avoid interest on the DeepHo card... fat chance with the lack of copper, but we would soon see.) So there we two were, in the fan/light fixture section. I picked out one at a median price that moved a lot of air while still being very quite - plus had a light and night light feature. Just what I wanted!

Problem was, they didn't have any in stock. I even got down on the floor and searched through all the boxes. No luck.

Mike and I met up shortly after. He had bad luck, I had bad luck, and the cart wasn't very full at all. It was very frustrating for the two of us, who were already frustrated that we were behind schedule and hadn't been able to get out and purchase these materials. The one night we decided to just do it - we're sh*t outta luck and outta stock.

Needless to say, we did not make the $299. I'll have to buy tile in cash since I don't have a Lowes card. (And don't want one at the moment.) Urg. Not as planned.

Maylay and Delay

It's been a full 10 days since I last said of our progress, "Wow." Today, on the other hand, I say, "Eh." Eh because we've accomplished nothing substantial. Eh because I've been just flat out dead tired and not feeling well. Eh because I had to work last weekend and that sent me into a spiral of exhaustion from which I am just now starting to escape from. Hey, other then that, things are just peachy keen.

I'm hoping we can start turning all that around this weekend. Already this past Tuesday night, Mike brought home a new filter for our furnace and installed it. (Whole house still smells like oil... or maybe I'm just super sensitive to it.) But we're both pretty happy since that seems to have fixed our whiny, noisy furnace issue.

The cement is probably dry downstairs at this point and ready for tile. Too bad we have yet to purchase the tile... It's on the shopping list along with all the copper piping to finish the rough plumbing. If we can purchase all that this weekend, great. If we can start plumbing this weekend, even better. If we can schedule the tiling... well, that would just be ice cream next to a cake that had already been iced.

In with the Water Out

Wow. That's all I have to say. Our plumber came out Sunday morning as planned and he and Mike hooked up all the drains (bathtub, toilet, sink) in under an hour. Mike spent the rest of Sunday morning and early afternoon cleaning out all the rest of the broken cement, rocks, and dirt from the basement. (Throwing large pieces up and out the window, carrying small bits and dirt up in bucket loads.)

By late Sunday afternoon, he was on his way to the DeepHo to pickup cement. 
By late Sunday evening, all the trenches and pipes within the trenches were sealed and re-cemented beautifully. Not to mention that the entire area was clean and free of cement debris.

Pipe Pattern

The Evacuator

Cat prints immortalized

To repeat, Wow.

Too bad the dump was closed today. (Monday)

Next up, all the copper piping to plumb the water "in." (Since we already have the water "out" covered... literally at this point.) Then tile, electrical, insulation, and drywall. As far as I'm concerned, all that is the easy part. Once the copper is bought and installed, the difficult and expensive part will be officially complete.

What a way to ring in the new year!

Not Enough Hole for My Pocket

Pipe – check. Lumber – check. Pocket door framed out – check….



Mike spent an entire laborious Thursday setting up for the pocket door. Turns out, we didn’t leave enough room after all. Mike had to modify the door to make it work and it took ALL day.



So, check your pocket door kit installation instructions before you do anything, everybody. You may need more space then you think.



And now we’re officially ready for Sunday – hoping we’re still on with the plumbers!

Happy Post -Holiday

Happy post-holidays. I’m so glad they’re over. Have I announced on this blog that we’re expecting? Surprise! 10 weeks and absolutely exhausted. I can’t take it anymore. I was dead on the couch for over six hours yesterday, unable to sleep, unable to move. Eating mass quantities of fudge. Yes, fudge. Shut up. I’m a blimp. I know.

Mike spent most of his pre-holiday break at work downstairs. He jack hammered out a space for the evacuator and dug out the dirt around where the pipes will go. He then painstakingly carried the dirt up and outside, two 5 gallon buckets at a time. So now, minus some pvc and lumber, we’re ready for this coming Sunday.


Once all the drains are plumbed, the flooring will need to be installed, then drywall, and then all the fixtures. (Hmmm, probably some additional plumbing between flooring and drywall now that I think about it.)

We had a very lovely Christmas, despite my near complete incapacitation. The house is completely destroyed by toys and I can’t bear to organize or clean yet. Or even think about it for that matter.

My parents got us a much needed new trash shed to replace our racoon & possum (yes possum) ravaged trash hut. On Monday Mike put together the new rubbermaid model in a record setting 15mins… possibly less. And most of that was getting the dang thing out of the box! I highly recommend this shed for ease of putting-together. Then, Mike had the distinct pleasure of destroying the old hut with the skid steere. He first rammed into it, the drove over it, then picked up half of it and dropped it on itself for good measure. I had the pleasure of watching the whole thing. It was highly satisfying. It’s going to be even more satisfying to be able to safely bring out trash in the evening, or put it out Tuesday morning for pickup without having to shovel trash debris from the half the yard first.