On most of these holiday Mondays, I feel like I’m the only one working. Yup, no three day weekend this Presidents Day. But while I was sitting at my desk, Mike continued to make progress at home, hanging more drywall. He even did some mudding in the closet.

He asked me to pickup some drywall tape on the way home, which I did. And when I arrived, I was surprised to find our neighbor pulling in almost right behind me. The two of them did some taping in the closet and then Mike continued on by himself for the rest of the evening.

I joined him after Mikey’s bedtime and we finished hanging the drywall. 100% complete.




Our neighbor will be over again tonight after work… He thinks he can have the entire room taped within an evening. A couple more days of mudding and sanding after that and we could be painting by this weekend. This, I did not expect. And I doubt we’ll have time to be painting this weekend, but you never know. Saturday night is a possibility…

It's Not Easy Being Green Drywall

The madness of the next four weeks began on Saturday, and I don’t expect it to slow down until at least 3/11. Saturday morning the electrician arrived and completed all our wiring in under an hour and a half. The recesssed lights, the outlets, the switches – everything – all set.



Sunday was outrageously insane. Immediately following breakfast, Mike called over our drywall’n neighbor to help him measure and determine the right amount of drywall sheets. Before 10am, the whole family was packed in the truck for the weekly trip to our favorite orange-themed home improvement warehouse.

This, we have down to a science.

Upon entry, we split up – Mike with the big cart, heading for drywall, and Mikey and I in the racecar cart headed towards electrical. While Mike got the drywall, screws, mud, and insulation, Mikey and I made a return, picked up plastic sheeting, a 2’ closet light, and a pancake box for the vanity light. We were even lucky enough to score a free two-person plastic kids sled at customer service. (I guess they don’t expect to sell them this winter.)

We all met back up at the register, having coordinated our shopping list across the store via our cell phones. Immediately I asked, “Where’s the drywall?” There was none on the cart. Then I saw the forklift… with half a pallet – 20 sheets of the mold resistant green stuff. Boy, did that add up. 20 sheets plus 2 buckets of mud plus 3 packs of R15 plus drywall screws, plus all the stuff in our racecar cart. To the tune of over $500.

Didn’t matter – we were on an orange-plastic funded mission. And we loaded up everything and headed for home. Our neighbor pulled in to our driveway right after we arrived. He and Mike unloaded a few things and got right to work.

The first challenge was the vent for the fan. Mike had the distinct pleasure of drilling through over 10” of solid PT to get a hole from the inside of the basement to the outside, at the bottom of the porch. (Think a thick sill plus thick farmer’s porch construction.) His hole saw couldn’t even make it all the way from one side. He had to go outside and drill from the opposite direction.


 By the time that was done, two of our other neighbors arrived and helped bring down all the drywall. Then, they took a break to walk around and mark the property borders using all their resources – online maps, printed maps, a super long tape measure, and a can of orange marker paint. Then they made some clams casino. Then, I was sent on a beer run.

(You keeping up with all this?) Just a day in the life here in this neighborhood.

They all headed back downstairs after “lunch,” built a small soffet over the sink area to hide a pipe that just couldn’t have gone anywhere else, and then cut and hung all the ceiling drywall. All the neighbors left after the ceiling was up, but Mike and I pressed on.



I finished the insulation as Mike continued to hang drywall. He and I both put up the plastic sheeting over the insulation, an extra moisture barrier layer, and then Mike went back to hanging.

After Mikey and I had dinner, and after Mikey was in bed, Mike was still hanging. I rejoined him to clean up and we called it a night with over 75% of the room finished.




Next step, of course, da mud. But that may have to wait. Next Saturday begins kitchen demo madness. I have to first empty everything from all the cabinets and prepare the room for demo. Sunday, demo.

For the week following, we’ll be in a rush to finish the drywall, paint, and small amount of electrical in prep for the arrival of the new cabinets.

Dam It Jim I'm an Editor, Not An Electrician

Mike did not call our electrician last week as promised. Over the week, he’s been installing boxes and doing some initial wiring… and had somehow by Sunday he had convinced himself that he could do it all by himself. All by himself with a little help from the internet. I said nothing until he started asking me questions about GFI’s. Me?

If it’s come down to I’m-The-Most-Knowledgeable-Person-In-The-Room about electrical… well, I think it’s time to call in a professional. Mike actually agreed. He made the call and scheduled for next weekend. (Almost too easy.)

And me? I’ve got to call on cabinet delivery dates as soon as I remember to grab the number. I’m thinking electrical this weekend – kitchen demo next weekend. That would leave us 1-2 weeks to do drywall and all other previously listed changes. Speaking of drywall, we’ll be ready for that downstairs too once the electrical is complete.

HOLY CRAP THIS IS ALL COMING TOGETHER! My Bday’s March 9th… I think I’m going to have a party.

Style of Cabinets - Color Isn't Very Accurate Here

Color is More Accurate Here, A Little Lighter - Swatch is Countertop

Kitchens and Bathrooms

It’s happening… the kitchen. It’s happening. Again, I can’t go into how or why, but I can tell you that the cabinets have been ordered and they’ll be arriving in 4 weeks. Current kitchen demolition begins in probably 2 weeks. I am literally beside myself.

The cabinets are beautiful – all wood, real wood, in a beautiful redish maple color. The hardware is hidden, the drawers pull all the way out, and the lazy susan is real wood too! Plus, all hardware, a pull-out trash can cabinet, and a cutlery divider were all included. Our kitchen design will change slightly, as the stove will move over to the left. We’ll have a new microwave-holding cabinet above the stove that can also accommodate a vent if we decided to get one. (New microwave and vent not included, but I’m sure we’ll find a way to add them before summer arrives.) We’ll have a new corner cabinet that abuts the refriderator – YES! Plus, two additional cabinets above that new corner cabinet. (Which originally I didn’t want, but they were also included with this special package deal… couldn’t resist.) Also, at the end of the dishwasher, where we currently have an oddly built shelf, we’ll have a cabinet.

And did I mention new countertops?! Not granite. More laminate. But they’ll be custom made and seamless. They’ll be light in color too – a change from the grey/black ones I’ve always loved. But I was talked into a light color and I’m really digging how it looks next to the cabinets. It coordinates well with the floor, which I hope isn’t too matchy-matchy. I usually prefer contrasting colors. But as I said, I was talked into it and feel good about it now.

So, what’s on the kitchen to do list in t-minus 2 weeks?
            Remove old cabinets, everything in them, and everything else in the kitchen
            Disconnect sink and dishwasher
            Fix and repaint all drywall (Except for the back wall, which we did last fall.)
            Temporarily remove one portion of the track light
            Move stove electrical to the left
            Move current outlet in stove’s way to the right
            Wire for new microwave/vent

We’ve decided not to re-tile under the cabinets. It’s just a pain in the butt and we don’t know if we have enough tile anyway. If we need to, we’ll use plywood to help level the non-tile cabinets with the tile cabinets.

Oh, and did I mention, we’re not the ones installing? Music to Mike’s ears. The first set of cabinets was such a royal pain that I promised him if we ever re-did the kitchen, I wouldn’t make him put the cabinets in.

There you have it. The countdown is officially on. I still can’t believe this is happening. Maybe I’ll wake up from it all tomorrow and be back in time to when we had no cabinets in the kitchen at all…

And the bathroom? Over the weekend I purchased ALL the electrical… or at least all I could think of. I bought a vent, one with high fan power, low noise, light, and night light. I bought a vanity light – modern design, nickle finish. I bought three Halo recessed light air-tight housings, two eyeballl trims, and one waterproof shower trim. I bought a dimmer switch. I bought lightbulbs for said Halo recessed lights. Dang it – I just realized. I forgot the closet light. Oh well. I bought a lot because I wanted to make sure I was over $299 to get 0% financing…. I made it! OVER $400 for all that.

Forgetting the extreme cost for a moment and returning to progress… Mike has already nailed up the recessed light housings and plumbed the vent. I keep reminding him to call our electrician, but I don’t think he’s done that yet. That will be next on the agenda. Once the electrical is complete, it’s insulation and drywall time.



Did I mention I picked out the paint color over the weekend too? It’s going to be perfect… with the tile… I can’t wait to see them together at last.

The Night Shift

Progress! Progress on a Wednesday, Thursday, and Friday at that. Progress in the evenings at that. Progress.

Wednesday night, Mike framed out the bathroom closet. It's going to be a good size - which is good, since we shop at BJ's.



Thursday night, the plumber was over and he and Mike did EVERYTHING. They finished the tub plumbing, put the tub in its place, and tested the entire system. No leaks! (First time for everything, right?) Mike even began cleaning up after the plumber left... but didn't get too far, since our shop vac's filter was plugged to the max. (Dang you Sears - the only place you can purchase your Crapsman Shop Vac Filter.)



Then, just this afternoon, I got a surprise call from Lowes! The tile is in... Early! What a nice end to the week. I picked it up on the way home and I am psyched! Mike picked up his filter and he is psyched! Ok, so maybe not, but it's still reason to celebrate, in my opinion.

Next step - electrical. Mike's bringing in a pro to help with this too - just to keep things safe with all the GFI's and such. Never can be too careful around water. But it shouldn't be a big to-do. A few lights, a fan, some switches, an outlet or two here and there... Done! Stay tuned...

And now for the other big news of the week. Big BIG news. The possible kitchen I alluded to in a previous post? It's happening! It's really really for really real happening. I can't share too many details, since this kitchen is a semi-covert operation. But I will tell you that we had a dude come out and measure. He drew out and planned a new design for us and found a great, economical cabinet manufacturer for us. I went and looked at everything - loved everything - and the order will be finalized on Monday.

There's only a little bit of stressful news to accompany all this good stuff... in prep for cabinet installation, there's a lot to do in very little time while we have a lot of other bathroom-related tasks going on. Of course all the old cabinets must be removed. Drywall needs to be fixed on walls and ceiling and repainted. No tile existed under the current cabinets - so we will need to add tile. The stove is moving over - hopefully the wire will reach.

Sometimes I wonder if all this is really happening....

A Tub In Time

Mike is a highly distractable dude. We've talked about this before... you know, the whole, "No New Projects Until Unfinished Projects Have Been Completed" policy that I try to keep in effect? This weekend, his goal was to put in the tub. Unfortunately, he got stuck on Sunday... he wasn't 100% confident on putting in the drain and had a slew of questions. He called our plumber friend who promised he'd try and come out some time this week.

But, with plenty of other tasks to be accomplished, Mike continued on, purchasing more lumber & doors for the closet and additional plumbing parts. And that brought Sunday to a close, since we had a dinner/tax date in the evening.

So, with all this to do downstairs, plus hooking up our new car stereos, plus hooking up our new Wii, plus a whole lot of other projects I shouldn't even mention.... what the hay - the new furnace filter, the Jeep go-cart project, cleaning the carpet/couch with the upholstery machine we brought home like 3 or 4 weeks ago... ok, I'll stop there. So, with all that, I was shocked to hear that he borrowed a metal detector on Monday and was gallivanting around the yard searching for our property markers.

Really? As I said, highly distractable. His reasoning was the putting up for sale of the house next door, who uses a portion of our property for their driveway. We don't mind that they use the land - we're just not giving it up. Still I ask, really? The house just went on the market and I'm guessing it will take some time to sell, just like last time.

And he didn't even find the markers he was looking for. The detector at one point beeped "GOLD" so he got down and dug... beer can. I reminded him again how useless I thought a metal detector was in our yard. For years, previous owners had buried their trash. (That's just what they did in the olden days.) So there's a ton of junk underground. We've found car parts, dishes, bottles, cans, and plenty of other worthless junk in the ground out there - simply by accident, or by digging.


Sometimes, you just can't argue with guys. I'm just hoping our plumber can visit us soon so this weekend doesn't turn into a scavenger hunt to nowhere too.

Is There Bathroom Yet?

Would you believe after our disappointing run to the HD, Mike went to begin plumbing and discovered that we’d purchased the wrong gauge of pipe? A fitting end to a trip fated for disaster.



But it all ended well, since on the same trip to return the pipe, Mike returned a bunch of lattice connectors (leftover from summer farmer’s porch work) that we didn’t need.



*And let me take a time out here because I had to FORCE him to take this stuff back. What is up with guys and returning stuff? Sure it’s been months. Sure we don’t have the receipt. But they’re Home Depot! Unless you’ve cut it, drilled it, or damaged it in some obvious way – they will take it back! But did he want to take it back? Noooooo. Not without me. I said, “Fine, I’ll go.” Then, the reply was, “But I’ll have to put away all the stuff in the garage…[that was littered about the driveway]” So I said, “Ok, then I won’t – but you’re going to take it back! I would do it myself, but it won’t fit in my truck.” He grudgingly loaded it up… And came back with nearly $50 in store credit from the lattice connectors alone! ($40 additional in cash from the pipe, which he’d had the receipt for.)



$50 that would have been otherwise just sitting in the basement until it was damaged and needed to be thrown away. GUYS! And by the way, I have embarrased myself plenty of times trying to bring stuff back that was cut, drilled, and/or damaged in an obvious way. So what? It’s worth the try every time.



Going back to the bathroom – Mike then purchased the pipe at his work for a better price. Boo-yah, meant to be. He’s been plumbing all week after a flair up of eczema on my face got us both back thinking about the ill health effects of that dang old bathroom.




And as for the tile? My sweet sweet sweet tile. I asked Mike to measure and give me the amount of tiles we needed. (12x12 makes it simple – one square foot each.) The grand total: 120 tiles, and of course we’d need extra. No problemo. I hop back onto Lowes.com, find my tile, put the price into my caculator and…. HAD A FREAKIN HEART ATTACK.



A box o tile contains 11 tiles. A box o tile costs about $58. I estimated we’d want to get at least 13 boxes. THAT’S OVER $700!!!!! Plus tax, thanks Massachusetts.



I was so flabbergasted.  I thought about it for over a week, looked at other tile on other websites, and even visited Lowes the store. $58 for 11 was a comparable price. Plus, I didn’t like anything else I saw anywhere else. There’s just not much choice in the Blue color scheme. Much of it was 12x12 squares made up of itty bitty mosaic tiles. No thanks.



I thought about it. Thought about it. Then last night, Mike gave me the news… he was going to be finishing up the plumbing. The closet would need to be built – a fairly easy task. And then the tile. That was just the next step.



I had to make a decision and I bought it. My plastic is still steamy hot from the transaction. Ugh. Who would have thought the flooring would have been nearly as expensive as all the fixtures?



It will be delivered to the store 2/8. Almost makes me wish I had ordered it a week ago, but no matter. Plenty of time to finish up the plumbing, closet, and tie up any other lose ends.



And we may be getting a brand new kitchen… yes. Maybe.

DeepHo Lack of Anything

With the beginning of a new week, Mike and I were all fired up to get back on track and back downstairs a-workin. But, first thing was first. We needed more materials! So Mike made a list on Monday and we packed up the fam and headed off to the Home Depot around 6:30pm.

Upon our arrival, we decided to pick out the tile first. They had NOTHING. And I mean NOTHING besides gross, ugly, mundane, monochromatic, or cheeseball. I couldn't believe it. No brilliant colors whatsoever (besides black - cheeseball) and no aesthetically pleasing textures or designs. It was all these boring earthtones - brown, brown, lighter brown, greenish brown, etc etc. They reminded me of tile you'd find in the bathroom at your local Casual Family Dining Establishment Chain. Ew and gross. No.

What I'm looking for is a brilliantly interestingly textured dark blue (like the deepest depths of the ocean and you get lost at sea just looking into it) tile. Big tiles - 12x12. Here's ones I like from Lowes: Awesome Tile This will be in stark contrast to the walls, which will be a light (but still "deep" if you know what I mean) grey. Think of that same day on the middle of the ocean... the sky covered in clouds - but not storm clouds. Peaceful, quiet grey... no harsh sun beating down on you. You're all with me on my design vision here now, right? The white tub and toilet, brushed nickle fixtures, and dark wood trim and vanity hint at a nautical feel without putting stupid boats and life preservers on the wall. Because I'm not "beachy," despite being a native Cape Codder, and I'm not "boaty" either. In fact, I have an aversion to either theme and all the related items sold at Christmas Tree Shops.

Long story already made long, we left the flooring department empty handed. I'll go to Lowes, where the tile selection is so much better. (This is where I purchased my mudroom tile.)

Next stop - plumbing, for all the copper piping and fittings. Only one problem. Hardly ANY copper pipes. And I mean there were like 5 for each size category. I'm not exaggerating. We picked them dry of the category we needed, (with 5) leaving a warped 6th pipe on the shelf. It was the most ridiculous thing I'd ever seen, especially since all the other shelves of PVC were stocked full. As you can imagine, this did not satisfy our list. Mike picked out all the fittings he could, but still couldn't find many of the other things on his list.

Mikey and I left him for a bit to pick out a fan/light fixture in the next aisle. (Didn't quite plan on it, but sometimes I don't get to go on these DeepHo trips. May as well pick out what I want while I'm here. Plus, we wanted to get up to $299 to avoid interest on the DeepHo card... fat chance with the lack of copper, but we would soon see.) So there we two were, in the fan/light fixture section. I picked out one at a median price that moved a lot of air while still being very quite - plus had a light and night light feature. Just what I wanted!

Problem was, they didn't have any in stock. I even got down on the floor and searched through all the boxes. No luck.

Mike and I met up shortly after. He had bad luck, I had bad luck, and the cart wasn't very full at all. It was very frustrating for the two of us, who were already frustrated that we were behind schedule and hadn't been able to get out and purchase these materials. The one night we decided to just do it - we're sh*t outta luck and outta stock.

Needless to say, we did not make the $299. I'll have to buy tile in cash since I don't have a Lowes card. (And don't want one at the moment.) Urg. Not as planned.

Maylay and Delay

It's been a full 10 days since I last said of our progress, "Wow." Today, on the other hand, I say, "Eh." Eh because we've accomplished nothing substantial. Eh because I've been just flat out dead tired and not feeling well. Eh because I had to work last weekend and that sent me into a spiral of exhaustion from which I am just now starting to escape from. Hey, other then that, things are just peachy keen.

I'm hoping we can start turning all that around this weekend. Already this past Tuesday night, Mike brought home a new filter for our furnace and installed it. (Whole house still smells like oil... or maybe I'm just super sensitive to it.) But we're both pretty happy since that seems to have fixed our whiny, noisy furnace issue.

The cement is probably dry downstairs at this point and ready for tile. Too bad we have yet to purchase the tile... It's on the shopping list along with all the copper piping to finish the rough plumbing. If we can purchase all that this weekend, great. If we can start plumbing this weekend, even better. If we can schedule the tiling... well, that would just be ice cream next to a cake that had already been iced.

In with the Water Out

Wow. That's all I have to say. Our plumber came out Sunday morning as planned and he and Mike hooked up all the drains (bathtub, toilet, sink) in under an hour. Mike spent the rest of Sunday morning and early afternoon cleaning out all the rest of the broken cement, rocks, and dirt from the basement. (Throwing large pieces up and out the window, carrying small bits and dirt up in bucket loads.)

By late Sunday afternoon, he was on his way to the DeepHo to pickup cement. 
By late Sunday evening, all the trenches and pipes within the trenches were sealed and re-cemented beautifully. Not to mention that the entire area was clean and free of cement debris.

Pipe Pattern

The Evacuator

Cat prints immortalized

To repeat, Wow.

Too bad the dump was closed today. (Monday)

Next up, all the copper piping to plumb the water "in." (Since we already have the water "out" covered... literally at this point.) Then tile, electrical, insulation, and drywall. As far as I'm concerned, all that is the easy part. Once the copper is bought and installed, the difficult and expensive part will be officially complete.

What a way to ring in the new year!

Not Enough Hole for My Pocket

Pipe – check. Lumber – check. Pocket door framed out – check….



Mike spent an entire laborious Thursday setting up for the pocket door. Turns out, we didn’t leave enough room after all. Mike had to modify the door to make it work and it took ALL day.



So, check your pocket door kit installation instructions before you do anything, everybody. You may need more space then you think.



And now we’re officially ready for Sunday – hoping we’re still on with the plumbers!

Happy Post -Holiday

Happy post-holidays. I’m so glad they’re over. Have I announced on this blog that we’re expecting? Surprise! 10 weeks and absolutely exhausted. I can’t take it anymore. I was dead on the couch for over six hours yesterday, unable to sleep, unable to move. Eating mass quantities of fudge. Yes, fudge. Shut up. I’m a blimp. I know.

Mike spent most of his pre-holiday break at work downstairs. He jack hammered out a space for the evacuator and dug out the dirt around where the pipes will go. He then painstakingly carried the dirt up and outside, two 5 gallon buckets at a time. So now, minus some pvc and lumber, we’re ready for this coming Sunday.


Once all the drains are plumbed, the flooring will need to be installed, then drywall, and then all the fixtures. (Hmmm, probably some additional plumbing between flooring and drywall now that I think about it.)

We had a very lovely Christmas, despite my near complete incapacitation. The house is completely destroyed by toys and I can’t bear to organize or clean yet. Or even think about it for that matter.

My parents got us a much needed new trash shed to replace our racoon & possum (yes possum) ravaged trash hut. On Monday Mike put together the new rubbermaid model in a record setting 15mins… possibly less. And most of that was getting the dang thing out of the box! I highly recommend this shed for ease of putting-together. Then, Mike had the distinct pleasure of destroying the old hut with the skid steere. He first rammed into it, the drove over it, then picked up half of it and dropped it on itself for good measure. I had the pleasure of watching the whole thing. It was highly satisfying. It’s going to be even more satisfying to be able to safely bring out trash in the evening, or put it out Tuesday morning for pickup without having to shovel trash debris from the half the yard first.

Hammered Out

The jack hammering is done. It was actually finished the same day I posted my last post... I was amazed.

Our drop cloth dust shielding

Some of the first lines in the floor cut with the saw

I guess you could call this the "before"

Here's the after - note the tunnels in the floor, now covered with the drop cloths to keep the dust down and the cats out.


At this point we haven't done much more. We had our plumber purchase the Evacuator for us. (Does what the name implies - makes water go UP into the septic.) Let me tell you, that thing is expensive. Even at his discounted pro price, it was still $420. Ouch. But I understand - this thing is IMPORTANT. You can't cheap out when it comes to moving dirty water.

Mike picked it up last night and scheduled our plumber to come out on New Years Day. (We'll see if that actually happens - I don't think either of them realized it was the holiday.) In prep, we have to purchase a bunch of PVC and accessories. Mike's goal is to have all the drains plumbed and the furnace serviced all in one morning.

Meanwhile, I'm thinking of the new bathroom every time I'm in the old bathroom. I want to be using it by the end of Jan - finished or no, it will certainly be functional by then.

Floored Again

Way back in the day when our basement was brand new.... (Yes, we lifted our house off it's original stone foundation and dug out and poured a basement. Check it out here.) We hired some random people to pour the cement floor. (Not included in your basement wall purchase.) And when I say random, I mean these guys saw our house lifted, stopped in, and offered to do the job. We took their card and said yes.

Thus far we've been pretty happy with our basement floor. I mean, come on. It's a slab 'o concrete. What more do you want of it?

But now that it's time to dig into it to plumb the basement bathroom, there's a problem. Mike brought home the big impressive saw to cut into the concrete last weekend. Turns out, that floor is 6-7" thick. Now I don't know much about basement floors, but that's freakin wicked thick! (NE accent, folks.) Mike seems to think it's only supposed to be around 2" thick. So he was cutting and cutting and cutting - up until the point I couldn't bare the cloud of dust anymore - and barely made any headway.

However, he was right in his assumption that it would be, "the messiest thing ever." Even with the bathroom area walled off with drop cloths and even with fans in two basement windows and the door to the outside open - the cloud of dust permeated upstairs into the house, lightly dusting everything.

Just yesterday, Mike brought home a jackhammer to begin the laborious task of removing concrete within the cut areas. He didn't have any goal set for today, jackhammer day, but he expected it to be slow and painful. I'm looking forward to checking out the progress later this evening...

Hostile DeepHo Takeover

Two empty carts and orange plastic in our pockets. An empty bathroom department, just ripe for a hostile takeover. Dream Day Sunday at the Home Depot.

Yes, there we were, picking out all our fixtures with all but blatant disregard for their prices. It was incredible.

First, the tub and shower enclosure. We chose the sturdiest tub option with a smooth shower enclosure that included built in shelving. Cost as expected, about $200 for the tub, $200 for the shower enclosure. (Caulk-less installation, cool!) That filled one cart. Mike dropped it off at customer service and returned with another.

Toilets. I wanted a name brand with Water Sense savings and high flush power. We chose a mid-range priced Kohler with those two features. $188.

On to the sink/vanities. Here, we ran into a snag. Mike wanted wood colored. I wanted white. We both wanted something of a decent size with the sink included in the price. There was nothing with a sink included that we could agree on, and the prices were outrageous. $400-$600 and no sink?! That was not what I had planned on. Then, around the corner, in between the aisles, there was a clearance vanity. A beautiful dark walnut colored, good size vanity with a white marble inset sink. "I like that one," I said. Mike liked it too, and it didn't have any major damage. Just some drywall dust a some small dings from a prior attempted installation.

We quickly brought over the sales lady who looked up the price, $199. SOLD. She even told us that we could probably get another 10% off at the register. We hungrily loaded it up next to the toilet.

Next stop, fixtures. Mike and I both immediately gravitated towards the brushed nickle and picked out a low to mid-range priced set for both the shower/tub and sink. (Matching at that!) Just over $100 each.

We didn't even bother with picking out the remaining needed lumber. This was a full truck load.

Amazingly, bringing it all into the basement was as difficult as we'd expected. The toilet was no prob. The vanity was a little awkward, but still no prob. The tub wasn't even a prob! The only challenging bit was the large shower enclosure back. No way was that fitting down the exterior basement door/stairs. But turns out we were able to easily bring it through the house's main entrance and down the interior basement door/stairs.



With everything in the room, it took just 15 minutes to arrange, rearrange, and decide on a layout. (And it definitely wasn't what either of us had originally imagined - yay for early fixture purchase!) The tub will go in the left corner, a closet will go across it on the right. The toilet will sit next to the closet and the vanity will sit between the two doors. In the end, this was the configuration that made the most sense to us.






Yesterday, our plumber friend came out to look at everything and advised Mike on clearances and all other things-good-to-know. The two of them will work together to plumb it out... hopefully soon.

That's a Big 'Ol Bathroom

Progress continues! Here, not even a week into this bathroom project, and three out of four walls are completely framed – vapor barrier up. The two doors, including one pocket door kit, have been purchased. And that 4th wall? Well, it would have been completed had Mike not run out of wood.

Next step - obviously, more wood. And I think it's time for the fixtures... (I'm looking forward to arranging things BEFORE plumbing them in.) 

Thanks Indeed

Turkey Day. A time to remember how thankful we are for family, friends, food… employment. And a big fat check from the MG guy! He’ll be here the first full week of December to load it up and take it away – thus ending our long long journey with that little red monster.

With money in hand, we were quick to disperse it. Mike paid off his friend for the purchase of his motorcycle. I paid off the credit card and repaid our savings for paying the credit card. I also paid off the fridge on the DeepHo card, bringing us back to a $0 balance on all fronts once again. What a great feeling! Much of the pressure we’d been building up over the past few months was gone immediately.
And, with our new found financial and obligatory freedom, we got right back to work on the house. I put up the tree and all the Christmas décor on Black Friday. (Staying as far from stores as humanly possible.) Mike picked up the Pex for the radiant heat on Saturday. Sunday, we really got down to business.
We didn’t get started until after lunch. (Notate that.) Then, Mike drained the heating system and disconnected the pipes downstairs. Upstairs, I moved the furniture in the kitchen and mudroom and disassembled the baseboards in both rooms. Then, it was off to the DeepHo for strapping and 2x6’s.


Upon our return, Mike quickly nailed up the strapping underneath the mudroom and drilled all the Pex tubing holes. Then, the difficult part. We both unrolled and tugged and pulled and fed and twisted and pulled and tugged and connected the tubing in and out of the floor joists. Not as easy as it sounds, since the tubing isn’t so flexible when hot water isn’t running through it.


We removed both baseboards from the kitchen and mudroom and put the former mudroom baseboard into the kitchen. (Wow, this means we finally can have an end-cap in the kitchen… no more no-name brand baseboard that we can’t find the ends to.)
And finally, around 6:30pm, Mike reconnected all the copper connections and pressurized the system. Kudos for re-using so many fittings too… although I wouldn’t advise doing such a thing. We had a couple leaks on first pressurization, but they were quickly fixed and the system was working beautifully by 8pm.
The whole job is made even more unbelievable when you take into account that we had to clean out and move just about our entire stock of lumber – which was all in the absolute worst spot ever. We had to remove it all from the saw horses, stack it, move the saw horses, and then put it all back on. What a pain in the butt… but good in helping us take stock of what we have. Lots of good sized trim pieces, for example. Plus, it was good reason to get rid of all the too-small or crappy bits. We threw those out the window.


Of course, that left us with a big mess outside to clean up at 8:30 at night. We were so toast, tired and achy at that point, but managed to clean at least the driveway.
And all those 2x6’s we also bought at HD? I bet you were wondering what those were for. Bathroom, baby, bathroom. Mike will begin framing TONIGHT. Boy, are we going to push forward with this one. It’s a Christmas gift to us and long time coming at that.

TUESDAY MORNING UPDATE:
Most of one wall is up!

Out of One Pool of Hot Water, Into Another of Cold Water

I’d like to report a momentous occasion… champagne at the ready? THE MG RESTORATION IS COMPLETE! Yes, this project has consumed nearly all of Mike’s free time over  the past year. His few spare moments waiting for parts were spent in complete exhausted frustration. This car has been nothing but what it was supposed to be – a simple put-together-the-pieces and hook-up-everything project. Instead, everything fought him. A million parts were needed. Work done by others was incomplete or incorrect. Mike’s own high standards frustrated him. He did many things he hates in the name of keeping things high quality and cost efficient, including all the upholstery.

Now, we just await final payment and approval from the owner. Check’s in the mail, or so we’ve been told. It was supposed to be overnighted Monday, but didn’t arrive Tuesday. It didn’t arrive Wednesday. It didn’t arrive Thursday. Nerve racking.

But despite the missing money, we have our lives together back! (Don’t forget, I’ve been practically a single mom for a year.) What a good feeling that is! Back to normal.

This weekend, I’m hoping we can move the mudroom baseboard. We won’t get many more 60 degree days now, but we’ll have one on Sunday and I’d like to put it to good use. Just bite the bullet and get it out of the way before my piano is ruined. I’m not going to run into a free piano I love more then this one.

After the heat is good to go and the money arrives – we’re starting on the bathroom. Gulp. Just got to jump into that one head first, no matter how cold the water is.

Oldy and Now Officially Moldy

For a while now we’ve known that our lone (single) bathroom was leaking water from the shower/tub onto the floor. The problem became all the more obvious when we covered the old floor with a cheap sheet of linoleum. Water continued to leak… and get under the linoluem! Squish squish squish – discusting.

Mike finally got around to purchasing a tube of caulk and re-caulking the entire tub at the end of last week. Unfortunately, after my first long shower after the caulk dried, squish squish squish under the flooring again. The problem seemed worse then ever. Mike removed the cold water handle and discovered that the inside was all corroded. Not a good sign. He removed the access panel next to the toilet and confirmed our fears.

The water wasn’t leaking outside and running down the shower and tub. It was leaking inside the wall. And has been for quite some time judging by the amount of MOLD in there.

I literally had a panic attack. Could this be the cause of my random onset of severe allergies?? (After never having had allergies before, I suddenly began suffering terribly during the winter of last year.) The very thought of it sends chills down my spine. And our two year old… I was petrified at the thought of any more serious health problems cropping up.

We closed the wall that night. Nothing to be done about it then. We only have the one bathroom, after all. But soon enough, as soon as MG money comes in, we have no choice but to build the basement bathroom and completely GUT the upstairs bathroom.

I began researching bathroom fixures on the cheap. (And might I just say that Home Depot’s website is just about the most useless thing ever. You can’t find anything on there and the navigation leaves much to be desired. Lowes website is much more user friendly, although I’ll probably end up buying at the Home Deepo.) 

Fixtures alone:
Bathtub/shower kit (with wall surround): $477
Small single vanity with sink: $100
Toilet (water savign): $100
Sink faucet (decent looking): $40
Shower fixtures (head & control): $100

That brings us to a total of $817 for the basic set of researchable fixutres. (And these are all near bottom of the line cheapest – without going completely ugly.)

Beyond that you have to take into consideration building materials:
Framing
Drywall
Pocket door (maximizing space)
Paint
Tile (for floor)
Electrical, including outlets, wires, etc.
Plumbing, including pipes, fittings, and don’t forget this is all in a basement so we need a pump
And all related hardware and supplies

Then there’s all the stoopid stuff you always forget to tally:
Shower curtain and rod
Towel racks
A mirror
Possible linen closet or other storage
Lighting
Bathroom fan
Heat (cause there’s none downstairs currently)

It’s been a while since we built something from scratch. We’re even trying to finish things now that we started from scratch years and years ago. Although, I’m looking so forward to demolishing the old bathroom. I’m going to personally wreck that thing and every single tile and fixture in there.

Nor'Easter Blowing Out Irene's Bad Luck

Doom and gloom update - literally, because at this date, this are looking up. I have not had any weird or catastrophic bad luck in the past four days... not since I broke part of the kitchen track light on Saturday. Yes, I was cleaning the fixtures that hold the bulbs when one came crashing down and exploded into a million pieces. At the time I was really broken up about it. (no pun intended) I bought this light years ago, what are the chances I'll be able to replace just that one fixture?? There's a good chance they don't even make ones to fit anymore... forcing consumers like me to buy a whole new track light. Companies just love to stick it to you like that.

But as I said, now I'm feeling more optimistic. The bulb to that particular fixture still fits in and lights up and there are still 5 other light fixtures on the track. I can live without for a while. Plus, after that incident, the weekend was great. The day previous, Friday, our neighbor came over and fixed the kitchen drywall. Mike even painted on a coat of primer for me in the same evening. That Saturday night, during the Nor'Easter, I painted the newly fixed drywall with the plenty-of-kitchen-paint we had left over from our last kitchen drywall adventure. (Fixing a hole in the wall.) Believe it or not, we even had kitchen ceiling paint leftover from the last time we painted the ceiling... which was the first time we painted it years ago.

Yes, we opened up that can 'o brown, expecting an unusable mass of chocolate colored goo. Instead, we found something that still sort of resembled paint. It was just a little thick. Mike added some water, stirred, added more water, stirred some more, and there ya go. Enough paint to paint what little ceiling there needed to be done.

I have to admit, I got carried away in the excitement and painted until after midnight. (Storm raging outside, lights flickering, and everything.) I painted the new drywall fix around the new window. I painted the ceiling where drywall had been touched up around the newly fixed wall. I touched up and lightly painted the adjacent walls. I painted the two doorways where it was yucky from fingerprints and furniture moving. I even chipped off a bunch of the crumbling paint from the area around the stove - ceiling and wall - and painted that. I even moved the stove, vacuumed up all the crud that was in there (tots gross by the way) and painted behind the stove where it had not been painted before! I went nuts and had a blast.



Then, I cleaned and rearranged some of my kitchen elements. I re-positioned the Mocha sign so that it would cover the phone jack on one wall. (I always had fond memories of a wall phone in the kitchen at the house I grew up in and installed one in my own house... Too bad home phones are outdated and I don't ever want to pay for one in this, the age of the cell phone.) I also re-hung my canvas martini signs and re-arranged some things on the countertop. It looked great.


Sunday, Mike purchased and prepared the trim for the kitchen window. (We spluurged, $25.) He shimmed the window opening, measured for and cut all the trim, and stained it. On Monday, he installed it all and boy does it look beautiful.

Meanwhile, I spent my Sunday fixing the printer and putting stuff on Craigslist. By late afternoon, I was actually able to print pictures to fill my art wall. (I was very satisfied with printer quality, by the way.) Now, minus one enlargement that I have to buy, that project is complete as well.


I couldn't have been more satisfied unless we had porch steps going in.