Stairs, Windows, and Random Plywood

Mike was feeling much better this Sunday. And, with cabin fever setting in, and Timmy due over (haha due-over) to work on the stairs, Mike decided to get himself back to work on the kitchen window. I had some friends coming over at 2:30pm, so the guys were on a strict stop-everything a las 2:30 deadline.


Mike measured the wall and the window, allowing for new-fridge and future-corner-cabinet width. Then, we decided on the exact placement of the new window.


Next step was to create the window frame and insulate the sans-window area. Then came the difficult part. You see - our mudroom was an addition, tacked on to what used to be a cement porch. Unfortunately, when they joined the exterior mudroom wall to the exterior kitchen wall, they did not do a very good job. The two walls are at two different depths....

So... if we want to side that entire side with siding and make it look like a nice, one-piece, continuous house with no stoopid additions that weren't done correctly... We would need to build out the kitchen wall to match the depth of the mudroom wall. Build it out how? Plywood. Layers of plywood.

Lucky for us, we happened to have plywood. Plywood in the basement, plywood in the garage, plywood in the garage addition... plywood plywood everywhere! Leftover from this that or the other project.


You can see here the puzzle of plywood Mike and our neighbor Richard put together. Amazing that we just happened to have just enough to complete the job. Unfortunately, the hunt for plywood + cutting of the plywood + installation of the plywood = longer then expected. Mike was hoping to be able to install the window before the 2:30 deadline, but just couldn't make it. He papered the plywood and called it done for the day.
MEANWHILE! Timmy was hard at work on the side steps. To start, he had to pull up some of the decking to make room for the first post. The second post went down on top of the footing Mike poured last weekend.


From there, it was a simple matter of framing and decking the landing, then the first step. By the time my guests were arriving between 2:30 and 3:00, they had a step to enter on. And by the time they left around 5:30, they had a second step to exit on.



Mike will need to pour some additional concrete for the final groundish-level landing step, but all in all, I'm totally psyched about how the steps came out. Mike decided to make them nice and big - key for bringing up large items, large amounts of people, large people, and holding hands with kids down the stairs.


To finish off the kitchen wall for temporary, Mike put up tar paper. This weekend, the window goes in, do or die. And Timmy will be back on Sunday as well. It's a whole new look for the holidays!


We're so happy to be wrapping up our summer/fall projects. Winter once again will take us indoors, where the basement bathroom will be taking shape soon.

PS - Guess who couldn't resist the Home Depot black Friday appliance sale? I GOT MY FRIDGE! It's the LG model lfx28978ST.... and I saved over $800. The MSRP is $2700 .... I bought for $1899. WITH 18 months of 0% financing and a 4 year extended warranty for only $80 extra!!! Boo-Yah! Only problem is I'll have to wait until Feb 5th for delivery. Backorder.

Corrections

Shortly after I finished my last post, Mike returned home, and I discovered that I had my story all wrong. Mike was actually removing the windows at the time of the incident. He had a window in his hands and jumped down with it off the ladder... and right onto a nail, which was sticking out of a board on the ground.

The nail didn't fully penetrate his foot, but went pretty deep. And lucky for Mike, it landed right through a nerve, making the injury very painful. He's been out of work and on crutches all week. The foot is looking much better today though, much to both our relief. Unbelievable how much a little nail can really mess you up.

Meanwhile, I've been working hard at leaving my own mark on the kitchen.


Mikey added the blue with a crayon... Of course, I thought to myself as he watched me write with a sharpie, "I should not be showing and encouraging him to write on the wall." Too late!

After that, Mikey and I did some decorating.

Beautiful porch & trees!

Mikey gets the candy canes!

And puts them on the tree

Beautiful!

Second Time These Windows Sent Somebody to the Hospital

An explanation for that title is certainly due. Several years ago - pre-baby, pre-prego, for sure, I had a TRIP at my house. (TRIP = Totally Random Incredible Party) This TRIP was in honor of my bday, a small affair that turned a little crazay thanks to a little green fairie.

We were all in the kitchen when Mike tripped (literally this time) and his hand landed on one of the old windows... and when right through the glass. And me? I was so excited about the window breaking. "I hate these windows!" I think I yelled, and started punching out the remaining glass panes. I may have destroyed the neighborhood had the guys not pulled me away to the sink, where they washed my now bloody hand and bandaided me up. Then I ran off and started dancin' but that's another story.

Mike and I post-accident at the TRIP with Wigs!

The next morning, Mike and I woke up with swollen, painful wounds on our punching hands and had a nifty story to tell the morning crew at the ER.


That was the FIRST time the old kitchen windows sent someone to the hospital. Now let me set you up for the second time.

Sunday, Timmy's son had a brand new baby - so he was definitely excused for stair-duty. But Mike decided to get started anyway. He dug and poured the one needed sonotube footing.


He also prepared and poured the larger slab footing.


But after that, he was excited to rip off the siding on the kitchen. Excited... PSHAW. You couldn't keep that man from his mission. But I'm proud to say, he set himself a stop point. He'd take the siding off, but not the old shingles underneath. Good thing. If the shingles came off, that was the point of no return. Shingles off - you have to put up plywood, take out the old windows, and tyvek. And at this point it was 1pm, soooo... yeah. Shingles off - he'd be working til midnight.

I'm proud to say he stuck to his stop point too! He took off the siding and then cleaned up and that was it!

Here was the outside of the kitchen - this morning.

We're getting to the hospital story now...

So today Mike got some free time and decided to finish up the job. He took off all the shingles and repaired the sill, which was leaking air like crazy. I talked to Mike on the phone and he said he could already feel a difference in how the room was holding heat. Awesome, I thought.

Now... somewhere between the shingles off and the plywood on, there was an incident. I'm still not quite sure of the details, but basically - nail gun + foot = mucho malo. (Our framing gun has gained itself a little bit of a temperamental reputation. I'm scared of it, personally.) Thinking it wasn't so bad, Mike kept on working. He took out the windows and completed the plywood.


Unfortunately, by the time I got home from work, he was in a whole bunch of pain and decided to go to the ER. He's probably on his way back right now, actually. He sent me a text and said they had to cut into his foot. Sounds terrible! I almost don't want to hear the details. And I definitely don't want to see the foot, but I know that's the first thing he's going to want to show me.

Anyway! (I'm not thinking about it!) Those windows were cursed, and I'm so happy they're gone. This is not a trilogy!

Window Wating

What a difference from last weekend's hustle and bustle! This one was calm in comparison - a much needed breather for both of us, for sure. Sunday was calmer then calm, since the guys weren't able to come by to work on the porch. Stairs next weekend! We even have the materials list in hand and soon to be ordered up.

We actually attempted to go to Home Depot, since we needed less then our usual HUGE load of materials. Plus, I wanted to check out and purchase a big 'ol window for the kitchen. (Tax credit expires 12/31 people!) But, once again, HD let us down. They didn't have the right length of board. Ok, fine. I'll give them that. So Mike went to pick out the next longer, no problem. But all the boards were of very poor quality. He gave in quickly. We didn't need them at that very moment anyway, so why not order them?

Moving on to the kitchen window.
We currently have dos kitchen windows with the fridge in between.

We'd like to push the fridge over to the left, ditch that first left-side window, and install a larger window centered on the right hand side. A little Photoshop action and you can see the possible result:


Pretty sweet, right? Imagine this with a new fridge.... oooo, so cool. (Literally)

So I researched the possible fridges I might want and found that they all were about 36" wide. (By the by, that's like 6" wider then our current fridge... imagine the space!) I then measured the approx space taken up by our corner cabinet, since we'd need to install a second one to butt up to the fridge. That was about 6" additional. In total, I figured we'd have a max rough opening size of 60" by 48" - and that's the MAX.

Back at the 'ol HD, we checked out the window section. I didn't imagine they'd have anything in stock to meet our needs. I thought we'd be ordering something for sure. But believe it or not, they had a 4' x 4' sliding glass window with screen in stock for the low low price of just $107.

That seemed like a super low price to me. For some reason, I had it stuck in my head that we paid around $100 for the small sliding window above our stove. Maybe not.

Then I started thinking out loud, well we've got more room then that. Maybe this is going to be too small. But as Mike pointed out, "How big a view of the DRIVEWAY do you want."

Excellent point.

We were there, the window was there, it matched our over-the-stove slider, and it was only $107. I'd be a ding-dong not to buy it. So we did.

Mike was even half tempted to seize the day, rip all the siding off that side of the house, remove both old kitchen windows, install the new one, and plywood the entire side. (Since we probably have enough ply in the basement to do such a thing.) But he also really needed to do some wiring in his truck as well as an oil change and a few other maintenance type things in and around the garage. In the end, sanity won out and we didn't rip apart anything. Probably for the best. No job that large is ever so easy that you can complete it in one day. Something always goes awry.

Next weekend, our wood will arrive and stairs will be built, come what may.

This Organization brought to you by Rubbermaid

I've written much about ClosetMaid. Specifically, ClosetMaid completions in the now discontinued cherry color. I loved that closet organizer - thought it was awesome, chic, high brow, etc etc.

But I was wrong.

Time travel back a few weeks.... I go down to the basement to put away a jacket in my locker (yes locker, a metal locker) full of coats & winter hats/gloves/scarfs, only to discover that everything has gone moldy/musty over the summer. After meticulously washing and airing out everything, I decided that I just couldn't reload the locker. History would just repeat itself next summer and I'd have to repeat the cleaning process all over again.

Solution - An organizer for the mudroom/laundry closet featuring a section for hanging coats.

Now, back in the day, I had all these lofty closet ideas for this particular closet. But at this very moment, I just wanted all those coats, hats, gloves, and scarfs up and outta my way... especially with the party coming down on us. I decided it would be easy and inexpensive to buy a couple of those white metal shelves. On a whim, I went to Lowes to check 'em out.

What I found there was a set by Rubbermaid that was completely customizable. Brackets could be hung on the wall, and then you could move your shelves up and down at will, place clothes racks on whichever shelves you wanted, and purchase add-on pieces that you could also move at will. I was completely blown away. It's called Rubbermaid Configurations. I purchased the 4 to 8 ft set, since I needed 48" shelves. (The set came with two 48", three 22", a bunch of clothes hanger bars, and all the brackets and hardware.) Note that I've added the image and link from Amazon.com... but also note - I did my do-diligence on this one and calculated that Lowes had the best price. ($93 at Lowes. Amazon is cheaper yes, but not when you add the shipping.)

We installed the organizer easily in just about an hour one evening and I couldn't be happier with how it looks. PLUS, if I ever want to change my configuration, add shelves, add hangers, add a sliding bin or basket.... I CAN! Seriously, I'm still freaking out over it.

Those stoopid ClosetMaid completions sets suddenly pale in comparison. They're expensive #1. They don't come with as many shelves and hangers #2. They take forever to put together and install #3. Add on pieces are even more expensive #4. You can't change your design once it's installed #5. And the cherry color I loved originally has now been discontinued and I can't get any more add-ons #6. (Yes, many bloggers have come forward and offered to sell me their pieces, but the shipping is just too outrageous.)

I'm now toying with the idea of ripping out my completions sets and replacing them with Rubbermaid Configurations sets. That's how much I love how the Rubbermaid turned out in the mudroom.







Check it out! The clothes bar hangs right on the shelf, so you can move it if need be. Plus I still have room for my dresser, which houses our sheets, and my cleaning cart, vacuum, and trash. If I ever want to add more shelves and move the dresser - I CAN!

Flying and Dying

We'll begin with the dying - as in, dying of STRESS, first and foremost. Crazy deadlines at work plus three days at a conference plus Halloween party prep plus mad errands equals massive brain hemorrhage. And the weekend before last, we headed out to the Woodshed Halloween party... not good. Or maybe it was, but I can't remember half the night. All I know - Sunday the 31st was the worst day ever and I was soooo sick. All day sick. Dead sick. Can't get out of bed, embarrassed like crazy, missed taking my baby trick-or-treating, infuriated at my stoopid self sick.

Then I woke up at 5am Monday and had to go to the conference.... (And now we go with the flying...)
Got back Wednesday night and started editing for Thursday and Friday deadlines...
Managed my Friday deadline by the skin of my teeth - like done at 4pm skin of my teeth....
And rushed out of work like a rocket to do party errands....
Cut errands short because Mike was sick....
Put the baby to bed and went back out to the grocery store....
Came home and made jello shots until 10pm.
Woke up early and didn't stop party prep until the party officially started at 8pm Saturday eve...
Partied until 2am and had an awesome time.
Woke up at 10 and cleaned until 3pm....
Then collapsed on the couch and watched movies while hacking my lungs out.

Did I mention I've been sick with a cold since Wednesday?!


 Mini Mummy Pizzas

Snake Sandwiches

Decor - Note Peeps are Werewolves this year


I'm Goldilocks

Jello Shots going fast

Group Pics

Can Dance

I'm so pretty!


You all have no idea how glad I am that it's all over. And everything was a success at that! The party was a hit and still the talk of the town two days later. The clients are happy with their videos. Mike is feeling better. I'm still sick, but at least I don't have madness to deal with. The only complaint I received:

Not enough jello shots. And I knew that, but I had no time to run to the liquor store on Friday night. It was too late by the time I was back out running errands. It's sad, because I can remember the days when we made 10 boxes worth of jello shots and were stuffing them down people's throats all night.... next year.

But ASIDE from all of that, let's reverse the clock and head back to Sunday 10/31. Yes, I was sick as a dog, but be that as it may, Mike and the guys still managed to install 4 out of 5 railings. (The 5th couldn't be installed since the last pole hasn't been wrapped since the stairs haven't been done since we needed the temporary stairs for the party!)


This pic was taken post party - note that we also cleaned up and brought back the furniture for the occasion. The party also gave us an opportunity to test out the electrical with my collection of halloween icicle lights. It worked perfectly! Mike even picked up a bunch of small hooks, which we screwed into the trim, to hold up the lights. These hooks will stay in permanently for all future holiday lighting opportunities.

This weekend, we hope work will commence again! Stairs... here we come.

Electrifying

Gung-ho, that was me. Bloggin on a mission and then POOF, drop off the face of the blogosphere for near to a week... leaving thousands in anger and suspense.

Or not.

But flaky and manic as I've been, it's all been for good reason. I've been extremely focused on crossing off items on that 'ol to-do list. First off, the electrical hook-up on the porch. Turns out, we had 9 of the 10 needed outlets in stock. And, Mike decided to patch the porch in with an already under-loaded breaker. So we didn't need that either.  So so... we were able to complete the wiring without having to head to the DeepHo.

But that doesn't mean we didn't head down there anyway. I still had a pole to return! And despite his grumblings, Mike was as glad as I was to bring it back and receive a $33 store credit, which we used to purchase porch outlet covers and concrete.

*TANGENT!*
While at the HD, we checked out the garage doors, which I'm planning to purchase for Mike for X-mas. (No secret. He knows, I know, and we're both happy about it.) This whole freakin' time, we thought they were mad expensive.

*SECOND TANGENT*
Years ago, when we were still in drywall-phase of the house, I had Overhead Door come and look at my garage for door-cost estimation purposes. Well, I don't know whether it was me looking so young, my house looking so old, or my vehicle and yard looking so.... redneck.... But the door dude had the audacity to ask my drywall guys if I "paid my bills." And I was so insulted that I completely severed contact with them - despite the fact that I had the cash and was ready to go at that moment.

But I realize now, it was meant to be. Because the HD has insulated garage doors in stock in store.... for the price of just around $250. When I saw, I sh*t. We don't need no fancy pants doors. We don't need no windows. (And we don't need no grammar either.) And apparently, we don't need to pay upwards of $1,000! Another $150-$200 and you can get yourself a nice garage door opener, complete with two remotes, an exterior keypad, and an interior button.

So, back to the current HD visit. After I had seen the doors and the prices on the internet, we just had to find out if they came with all the springs, tracks, etc. needed to install. Sure enough, everything came in the box! Amazing, isn't it? Three doors, coming right up this holiday season!

HD visit: successful on so many levels.
Electrical: complete!

And now for the bad news. Or, I should say, postponement news. Timmy was called into work on Sunday and couldn't come over to work on the stairs. Mike used the time to complete the electrical, so I can't complain too much. I was really hoping and dreaming that we'd be able to get the concrete poured.

I found out, by the way, that we in fact do not need sonotubes because we're not going to pour footings. We're going to pour pads. Big pads! iPads! (Sorry, couldn't resist.) So the entire footprint of the stairs will be concrete. This is beneficial in a few ways. First, it is a far lesser pain in the butt then to dig and pour footings. Second, with concrete under the entire stairway, there's no chance of annoying plant growth. I'm cool with that.

Unfortunately, we don't know what materials we'll need for the stairs, so we couldn't purchase those. The railings, however, I am going to have Mike purchase tomorrow for delivery on Friday. I figure, if the guys pour the pads on Sunday, they're going to need to dry. What to do while the concrete is drying? How about some railings! Sounds good to me, I just need to remember to send Mike to work with the paperwork that shows what to order.

Truck'pdate, Smidgets, and Upcoming Electrical

At around 11pm Tuesday night, the truck arrived! (Safe and sound, I might add, much to our relief.) So here it is, Thursday, and I haven't even gotten much more then a glimpse of it. I was in bed when it arrived, rushed out of the house Wednesday morning, rushed into the house Wednesday night, crashed early to bed, and rushed out of the house this morning... not that it mattered, because the truck was gone at that point anyway. Mike drove it to work today.

How, you ask?

Turns out, he didn't need to wait 24hrs for that fuel pump. He ordered it in the AM - received it in the PM - and went straight to work as soon as he got home. I had no clue what was going on. He didn't even come in to say, "Hi what's up? Got to get to work, the fuel pump came in early." Oh well. I found out eventually. (Although I didn't know how it turned out, since I crashed early. Apparently, it turned out just fine if he's driving the thing....)

The early fuel pump pushed back my electrical plans. Honestly, I thought Mike had just plain forgot about it, but he texted me this morning, "Got to do some wiring for you tonight." Silly me, I'm imagining he's still talking about the truck. I thought, "Why the heck would that be for me??" Then it hit me - DUR. I'm the one that forgot... but only for a second.

So there's the outlets and the breaker... should probably get concrete and some sonotubes for the stair footings.... unless Mike had those at his store. Speaking of which, how bigga footings we talking about here? Do we need a hole digger? I have no clue. And if the side steps are going up the side of the house.... is that side going to need de-siding?! And if we're in the process of de-siding the side, should I be ordering a nice picture window for the kitchen, where new siding equals new window configuration because you don't want to side just to de-side and re-side?!

These are all questions I do not have the answers to.

Speaking of stuff we need, I should probably add trim for front door to that list. And speaking of the front door - where the heck is the doorbell button?! We really need to put that thing back on again.

And it's Thursday - should I be ordering materials from Morse right now?! Should I be ordering railings from Morse right now? Should I be asking you all these questions?!

Probably not. You'd probably go nuts and tell me to buy up the whole Home Depot.

OH - DOODES! I'm seriously going to return that extra steel basement support thing we've had in our basement for the last three-four years. I don't even care if I only get $2 for it. (But $1 and I'm walkin.) And no Mike is going to stop me this time. MUAH-HA-HA-HA!

But seriously, all questions aside, we need to have electrical up and running and we need to prepare for Sunday. *Was that just thunder?! Why does it rain every time we need to buy concrete?*

Switching topics - I finally remembered to take those pics for you.

Ok, so a little out of focus, but you can see the Smidget clearly here. Think it's no big deal? Doesn't look anything fancy to you? Well, just check out the wide shot:

It looks good. I mean, real good. And it's not even puttied and painted yet! (At this point I'm losing faith that I'll have the painting completed by party-time.) Another brilliant Tim-Idea.

Electrical updates due tomorrow!

Pole Wrapped

Yesterday was a perfect day for pole wrapping. Sun, fair temps, low wind... heavenly fall to say the least. And within a few short hours, the three guys had finished 4 poles!!! They would have even finished the last and final fourth pole, but this one is currently holding up our temporary steps... which, we're still in need of at the moment.

Plus, Timmy had a marvel idea. (And once I explain this, you'll see why I just love him to death!) You see, to fit the posts, the white pre-primed wood needed to be cut down by just a smidget. Obviously, that leaves us with a bunch of scrap smidgets. Trash, you ask? I would have thought so too. That is, until Timmy held one up to the ceiling where the trim meets the bead board. USE THE SMIDGETS TO TRIM THE CEILING! Oh my god, it was a revelation and it looked fabulous! So simple, but we never would have thought of it. We would have just gone out and spent hundreds of more dollars on trim, then burned the smidgets come January when burn season opens up.
Timmy, once again, saved us some big bucks. So I was so happy and excited to write him out a big check that very afternoon. (And, he never asks for any money... usually refuses it, actually. Which made me all the happier to finally be able to give him a substantial amount.)

Anyhoo - check out the new frontal view:

 
 Pretty swank, isn't it? (I forgot a pic of the smidget trim - I will try to grab one tomorrow.)

Once the poles were finished, the guys attempted to complete the trim up on the gambrel. (At the peak there.) However, something about having the wrong saw or no blade or something like that prevented them from completing it, and they ended for the day.

Plans for next Sunday - the steps begin! Concrete will need to be poured for the step footings, which I had never realized before. Once it cures, the steps can be built. Then - duh duh duh duh - railings. With the Halloween season upon us, I'm hoping to get an early jump on the railings. I have these crazy imaginings that I'll order them and have Mike pre-assemble all the sections so we're ready to slap them up as soon as possible.

Whether he'll be hip to that idea is another story. Hopefully, (oh please oh please) his new truck will be arriving via pro vehicle transport tomorrow. And once it's in our driveway, he's going to do nothing until he installs the needed fuel pump.

But I warned him last night! I said, I'm going to need the electrical on the porch hooked up for Halloween lighting. And I'm going to need it like, this week. On the shopping list there: all the outlets and a new breaker. With the truck arriving tomorrow, we should actually go out and purchase those like... oh, I dunno... NOW.

Halloween Party is Nov 6th.... the race to the finish is ON!

Week of A Million Catastrophes!

Well, of course #1 Catastrophe: Mike returned from South Butt late Monday night/early Tuesday morning sans Dodge. And upon his return, I got the entire U-Haul scoop, which was, unbelievably, worse then I could have ever imagined. (Full disclosure expose' to come!)

#2 Catastrophe: A crazy guy set my office building on fire last Monday night. Thank god our offices are in back - they sustained no damage. But due to the arson investigation and then lack of electrical power, we were unable to get into the building until late Thursday afternoon.

#3 Catastrophe: Crazy mad deadline rush at work Thurs-Fri!!!

And #4 - #1 million Catastrophe were of course, smaller in nature, but all directly related to the first three major catastrophes.

All in all, a week that most certainly took some years off my life. But, amidst all the stress, I have good news to report.

Firstly, Mike and I found ourselves together on Tuesday.... yes! Together on a weekday during normal business hours! (Imagine that?) So after Mike finished his lengthy phone calls to U-Haul, we high tailed it over to Morse Lumber to pick out railings for the farmer's porch. Azek was the composite brand recommended to us - good quality, a best seller, and no-maintenance. (You have to think to yourself - do you really want to re-paint railings year after year? Square poles and trim are one thing - one easy thing. A whole buncha railings and balusters?! A whole buncha pain-in-the-butt.)

We selected a basic white model - no frills, but complete with the bracket-hiding kit or whatever they call it. We'd need 8 sections, not including the stairways. (The figuring for those will come at a later date, as we haven't spoken to Timmy about them yet.) Total cost, approx. $1400.

That probably sounds outrageous.... and, admittedly, we could probably purchase wood for 1/3 of that... but I just don't want to go wood. Wood posts - fine. Wood trim - fine. Wood railings?! Not so much, in my opinion. We saved a boatload going wood on the rest of the porch, so I feel like we can spluurge a little bit where it's going to count.

We didn't order, since we want to check in with Timmy and make sure it's cool. Luckily, what we want is in stock, can be delivered next day, and likely be installed by Mike in one weekend. Each section comes in a box. You just put the pieces together and then attach to the poles. Hopefully, it will be easy.

(Pole wrap hasn't been completed yet, as the guys took this Sunday off, which worked out for us as you'll see in a moment.)

Secondly, 4Runner #1 has been sold! Though I didn't get quite as much as I was hoping, it's gone and the buyer was very happy with it and understood all its problems and quirks. Sweet. Two vehicles down, one to go.

Third, I return you to this past Sunday. As I said, the guys took a break from the porch, so Mike jumped on the opportunity to get Dodge #2 put together. (You know, the one in pieces in the back yard?) He devoted near to the entire day on it and stopped just short of 100% completion. He'll need a little more time, but when it's as tidy as can be for $0, it can be put up for sale as is. And with the sale of Dodge #2, we'll have no more extra vehicles!!!! (Amazing to think.)

Monday, Columbus Day, I took it upon myself to paint the garage and garage addition. I painted the garage white about two years ago.... then we picked out a grey siding for the house. So that white was in need of an update, plus the addition needed a coat of SOMETHING before winter. And what better time then a random Monday off?

Back two years ago, I did the job with a roller and a brush... and it took me hours upon laborious hours. Days, in fact. Yes, I'm pretty sure it took me days. This time around, however, I had a new painting weapon. A super duper power painter.  This thing painted one side of the garage is less then 5 minutes. It took longer to clear away all the mechanical misc from either side then it did to paint! I was blown away! A little bit of touching up on the trim from over-spray and the job was done.

Of course the job still took all day.... Why? Well, the clearing and cleaning up of all the mechanic misc of course! (I took the initiative and loaded up that garage addition. I mean, come on. It was empty and all this junk was outside, next to the garage. Ridiculous!)

Just check out the awesome results:

Look, Ma, no junk!

 Complete With Matching Addition

And the Other Side - One Hood and One Wheelbarrow Left, not too shabby

We survived the Week of a Million Catastrophes and somehow managed to come out.... well, not on top, but pretty high in elevation nonetheless. At this point, no expectations for this week. My brain is no longer processing information.

When Things Are Too Quiet...

With Mike and a couple of his friends off on a Dodge 2500 extended cab buying adventure, and Mikey being such a sleepy baby, I was able to take in some serious R&R on Sunday. Plus, Timmy and Richard were over to start on the posts - and they brought me a coffee! Life is good, right?

Timmy had to leave around noon, so it was a short work day, but they got one post wrapped with a promise that the rest will fly, since they now have the method down. The two plan to return to work one night this week at earliest. Sweet! I was happy with that, for sure.

Plus, I finally got someone who will come to the house and design the yard for me in terms of plantings and such. Woo-hoo! He and I tentatively decided to meet up perhaps next weekend or even some time this week if the opportunity presents itself.

Everything was so smooth.... so relaxing.... So I should have known that the sheet was about to hit the fan. And when I say sheet, I mean U-Haul. And when I say hit the fan, I mean smack us in the face with the wrong trailer. Let me elaborate.

Firstly, understand that this particular Dodge 2500 is in its current condition, un-driveable. Needs work. (Not much - and the price is right - it's worth it.) In Mike's words the truck is "awesome" and just what he's been looking for. We're saving in total $6500 - $7500 on this vehicle.

Here's the initial catch - the boys had to travel a good distance and way into the sticks of South Butt* to pick up the thing. Mike enlisted his BFF Andy and his Dodge diesel along with another friend to help. Mike reserved a large U-Haul trailer at the South Butt location for the price of $250 at our local U-Haul office. The one-way trailer would save us big time in fuel and tolls. The guys would travel down sans trailer, pick it up at U-Haul, and then drive back and return the trailer to our local U-Haul office. Good deal.

Or so it would have been if it had happened as it was reserved.

Mike purchases the truck this morning and the guys go to pick up the trailer and U-Haul. But the one they have is not the trailer Mike reserved. It's too small. It's also $450..... ok hold the phone right there, nearly double the dough for a smaller trailer?! But it's all they've got and Mike grudgingly pays for and takes it in the hope that it will work.

It doesn't work. It's too small.

The boys spend the next 4 hours in a desperate search of South Butt for a proper trailer. But Butt is a rural area and choices are limited... very limited. After four hours of wasted time, the guys have exhausted all resources without a solution. Mike is forced to put the Dodge 2500 in self-storage at the South Butt U-Haul. Lucky for us, at least they agreed to give him that for free.

And now they're en route home. Without the truck. We'll now have to pay to have a professional vehicle transport go down to get it. Add that cost to the cost of this trip - the fuel, the tolls, the food and bev for three guys, the one night hotel stay, and not to mention the 48 total hours of 100% wasted time. Does not compute!

Mike had near to $1500 extra with him on the trip and spent it all on the above mentioned trip-related expenses. So we're basically out $1500 plus another $500-$1000 for a vehicle transport?!!

I'm livid and I haven't even heard the entire story yet. U-Haul is going to get it from me. They owe me at least $2000, but I know I'll never see it. I'm going to read them the riot act though.

By the time you read this, the boys will be home, as I have delayed the post time of this post.
I can't wait to begin drafting my complaint.

*When I say "South Butt," I hope you all realize that I am disguising the actual location with a silly name that's fun to say in conversation. If there is a real place called South Butt and it has a U-Haul office - I recognize and admit that it had nothing to do with any of this wrong-doing.


Get a home insurance quote from Direct Line,
voted Britain’s number 1 insurance provider.

Putt Putt Putt

Before I commence with the home updates, I'd like to take a moment to recognize the vehicle previously known as Dodge #1 - now known as SOLD. You have no idea what a relief it was... watching it drive away last night. (Especially after the 45 minutes or so in which we couldn't find the title. That ordeal took a few years off my life, it was so stressful... what with the buyer in an airplane on his one way ticket here from south butt.)

That leaves the Dodge tally down to uno - Dodge #2. Fixing that up to a reasonable state without any major parts purchases is vehicle goal numero dos. Meanwhile, stress level goes back up through the roof at the end of this week, when Mike will be doing some traveling of his own to pickup a new (used) Dodge 2500.

Vehicles on my mind. Anyway! Forcibly pushing aside those stresses, it was a great weekend. Productivity and optimism were both up something percent.

Saturday, despite battling some crazy sinus thing that I've had forever that decided to come to a head at the end of last week... yeah, despite that - I completed puttying on the porch trim and ceiling. Sunday I even had an opportunity to paint some more of the ceiling! (More, but not all, unfortunately.)




Mike decided Sunday morning he finally wanted to install that cat door we've had new in the box for probably about six months now. (Back when we put in the basement and basement stairs, we left a hole in the hallway/stairway wall for the cats to go in and out of. Since having a baby, and since stuffing a pillow in the hole for cat-control just isn't the best cat-control method, we knew we'd need a proper cat door.)

Installing the thing was actually more of a pain then you might imagine. You see, the small-cat cat door is square shaped. The large-cat cat door is not. It's circular on the bottom. We have large cats... and we made a square shaped hole when we made our hole years ago. (Back when we didn't have the cat-door shape knowledge we have today.) So Mike had to trim the hole and cut a new - half circular - piece of drywall to be able to install the thing.

And I must admit, it looks pretty good. Trouble now is the cats don't know how to use the thing. And no, it's not one of those auto-opening-when-the-collar-gets-close type of door. Those things are mad expensive. But this one does have a magnet at the bottom to keep the door shut tight when not in use. Too tight, I'm afraid. The cats don't know how to (or just don't want to - because let's face it, they are cats) push the durn thing hard enough.

But, bottom line, after 17 months, I'm happy to cross "Cat Door" off of the list-of-stuff-that-should-get-done-but-nobody-cares-about.

Speaking of that particular list, Mike had the brilliant notion after finishing the cat door that he'd like to complete the siding on the top of the gambrel of the house. He called our carpenter friend TJ, who came over in the afternoon to give him a hand.


TA-DA! Now, we can officially call siding on the front of the house - DONE! We still need some trim up there on the top peak, but that's for another day.

To complete the weekend, Timmy and Richard came over to give us another materials list for this coming weekend. This time, it's time to wrap the posts. And lucky for us, we still have some of the needed materials in stock. Mike ordered the rest today and it should be delivered tomorrow.

Me, I'd like to finish up painting. Soon enough I'll have to paint out all the pre-primed white board - white - and the ceiling again - in its actual blue color. It's all on the list-of-stuff-that-everyone-cares-about. Just as soon as those posts are wrapped up tight.

After that? It's railing time. Mike and I have to make time to go and pick out what we want in that department. Hopefully Morse Lumber is open before 9 on a Monday, because that's the only time we'd have within their business days/hours.


Get a home insurance quote from Direct Line,
voted Britain’s number 1 insurance provider.

Playing with Putty

After I returned home late last Thursday night, and after Mike dropped the bomb that he'd be fixing the floor in his Dodge on Sunday, I scrapped any vague hopes of progress over last weekend.

But be that as it may, we still made a couple baby steps forward. On Sunday I began puttying all the nail holes... and managed to fill quite a few before Mikey woke up. (There are still quite a few more to go, but I'm hoping I can finish up this weekend.) Also, a plumber friend of ours came by to impart some of his infinite plumbing wisdom in regards to a basement bathroom. (I'm still trying to reel Mike in on this one - I'm shocked he didn't want to halt work on his floor to begin framing the thing out!)

All in due time, my friends.

And now look at this - it's Wednesday, end of day, and I don't have a clue and half what the next step is or how much it's going to cost or when it can be implemented. This weekend is starting to look left out too...

At least a dude is coming to purchase the Dodge on Sunday morning. Yes, when I wake up, one Dodge will be gone. Mike hopes to schedule some time off so he can rock and roll on Dodge #2. Stick that on the market, make some more money, and buy a 2500. That's the plan. Those 2500 4x4 diesel quad cabs don't come cheap though. 3500 dually's though? Dime a dozen these days. The automotive market is so ackbasswards right now.

We've got a dirt bike on craigslist too... hoping to dump for $300 - 1970 Yamaha DT-250. You know you want it!


Get a home insurance quote from Direct Line,
voted Britain’s number 1 insurance provider.

Happy Surprise

Here I am work-a-holicking at a conference when Mike sends me a text:
"Farmer's porch trim is done." Followed by a picture:


Note the neat white trim from the start of the farmer's porch, straight through and now over the top of the mudroom. Ok, wow, I was thinking. That's great. "So what's next? The inside side trim?"
That was replied with another picture:


"All that's left is the post and 1/2 round"

Here note the trim where the porch ceiling meets the house. I freaked out. No way had I expected it ALL to be done! I wished I'd been in a position to actually call him back to chit chat about it. "Show me by the door," I replied hurriedly.


I'm impressed. Straight out impressed. I didn't even know if the guys would be working over the weekend, so what a nice surprise!! To think... next we'll wrap the posts. Perhaps this weekend?


Get a home insurance quote from Direct Line,
voted Britain’s number 1 insurance provider.

Unworthy of Even a T-Shirt

So Hurricane Earl turned... literally turned... out to be a big fat sack of nothing. Durn it, no "I Survived Blah Blah Blah" t-shirt.

And eventually we'll have the unhappy task of moving all the lumber and patio furniture back up to ground level from the basement... but not this Labor Day Weekend. Yes, as usual I had high hopes for big accomplishments over the past few days. Unfortunately, I've been feeling like poo for most of the weekend and couldn't bring myself to do anything Sunday and Monday.

Mike managed to cross off some long-standing items on his to-do list. Fixing the snow blower for neighbor 1, fixing the lawn tractor for neighbor 2, fixing his own lawn tractor, installing his fuel pump, fixing the mini 4-wheeler, fixing some dude's 4wheeler, returning neighbor 2's tiller....

I suppose it's a very good thing to have all those things taken care of - especially as we go into fall and we look towards cleaning up the yard.

But I had really wanted to go over to the HD and pick up wood putty and trim for the porch. (The more we've thought about it, the more we've thought that caulk will expand and contract - wood putty is made for nail holes, so we may as well do the right thing and use it.) The trim we need will go where the bead board ceiling meets the pre-primed white interior wrapping as well as around the front door.

I dreampt of purchasing it all and painting it all... but no such luck.

Mike also mentioned the kitchen to me again... I said don't tempt me, I'll buy a window today. So maybe it's a good thing that this sinus thing kept me unmotivated and stuck in the house. I probably would have purchased a big 'ol window. (Though I did scold him once again, "Read my lips, No NEW projects!")

Oh, and then he started with the, "You better start thinking about the layout of the basement bathroom."

And I'm thinking to myself, "Dude, you are getting waaay ahead of yourself here." It is so impossible to keep him focused sometimes. I need to tattoo "FINISH THE PORCH" on his forehead or something.

Speaking of which, Timmy had some parties 'n stuff this weekend, putting further construction on hold. Which is cool, because as I said, Mike had things to do, I wasn't feeling well, and let's face it, Timmy's been working weeks straight on our house, so a break is more then well deserved.

Back to work this weekend? It's not up to me - I'll be working I'm afraid.


Get a home insurance quote from Direct Line,
voted Britain’s number 1 insurance provider.

Hurricane Earl A'Comin

Ah, Cape Cod on Labor Day weekend. Time to kick back, roll down the windows, and prepare to sit yo' ass in traffic for the next two hours. And, oh yeah, there's a hurricane a'comin!

Having already lived through the "I Survived Hurricane Bob" t-shirt craze, I can't wait to add an Earl to the list of incredible Northeast natural disasters. But, since we're always under construction at home.... and since we're always a mess in the yard... we have some doings to do to prepare, and we don't have much time in which to do them.

Take in the porch furniture
Take in tools and other small items littering the porch
Secure all lumber
Take in the plants
Move the grill inside
Secure the trash hut
Move all machines inside the garage
Move all machine parts inside the garage
Secure Dodge #2
Secure the boat and camper
Put all trash in the trash hut and secure it again!
Take in Mikey's bus
Start up the generator and make sure it works

So far, the latest info from weather.com shows Earl hitting us sometime late Friday, early Saturday - with wind gusts of 90-100mph. Although they admit, these are only just educated guesses.

This will be our first hurricane in our home, but I doubt it will be the last.


Get a home insurance quote from Direct Line,
voted Britain’s number 1 insurance provider.

Round the Front

This Sunday we celebrated a momentous occasion. The completion of the top exterior farmer's porch trim! YAY!


It looks amazing! Like suddenly it's a real live actual porch.... And that's not all! For super coolness, check out how Timmy did the left hand side.


Yes, that's right folks. He added some siding in the triangle to make it fit in with the rest of the house. (Or the rest of the house when eventually it's all sided with that siding.) So awesome looking and so much better then just white trim in there.

But the guys didn't work too much on Sunday, having family parties and other affairs in the late afternoon. I was just psyched to see that exterior trim. The interior trim is next, followed by pole wrapping. And lucky for us, we still have some materials left. Hot dog!

Then, on Sunday evening, Mike mowed the lawn and weed whacked everywhere. What a difference that made! It's like a whole new landscape! That, plus yours truly took a moment to clean up some of the debris in the backyard on Saturday. Thank you, thank you. Hold your applause por favor.

Oh - and then the guys started tempting me... talking about extending new siding out through the mudroom and kitchen side... which would mean a big new bay window in the kitchen and removal of two of the remaining three oldy cruddy gross 1950s windows in the house.

Ohhhh.... seriously. Don't tease me like that. I'm going to start getting all excited!



Get a home insurance quote from Direct Line,
voted Britain’s number 1 insurance provider.

Coming At 'Cha

More materials are en route! At this point I'm hoping the whole thing can be finished by the annual Halloween Party - first Saturday of November... so I have to keep things moving, no matter how po' I feel. (Yes, as you can tell, no trucks have sold as of yet.)

I quickly realized today that, "hey, it's friday!" and if I don't want to be driving my butt to Morse on Saturday early AM, Mike needs to order materials. I sent him a text this morning and sure enough, they'll be delivered tomorrow morning.

Still on the to-do list, more painting, all the caulking, and purchase of trim.




Get a home insurance quote from Direct Line,