Friday the 27th – day four past my due date. I’m
tired. Lethargic. Bored. Most everything has been done… I’m procrastinating a
whole lot of stuff that doesn’t matter too much. Like D batteries. I’m not sure
if I have any. And I don’t feel like checking.
The office/nursery is all set up except for a random extra
changing table and the bassinet, which are both just hanging out in the room
for now. Both will eventually go into our bedroom – again, I just don’t feel
like making the rearranging effort until I need to. Mike will have some time
off to help me when this baby finally does come anyway.
And have I taken a picture to show you all? No.
Meanwhile, other things are just trudging along slowly. Down
in the bathroom we put up one hook for towels, a toilet paper holder, and all
the lightbulbs for the vanity and fan fixtures. I bought a dimmer switch and a
wall plate to go with it yesterday on my way home. That will probably go up in
the coming days along with the closet light and light switch. I’m also looking
forward to doors… nothing new in that department yet.
Outside, the chimney foundation is still as it was. We’re
still waiting for the town to come and inspect. In the past week or two, heavy
thunderstorms have caved in the hole more then once. Mike dug it out, then dug
it out again, then dug it out and made a barrier of wood scraps to keep it from
washing out. So far, it seems to be holding, but we hope for the inspection
soon.
No sign of our carpenter in regards to work on the porch.
But we were all out of the house on a family outting last Sunday anyway. Doesn’t
much matter since we haven’t ordered or even listed out the next round of
materials needed.
And that’s just about all the news that’s fit to print. Mike’s
had a ton of misc stuff of his own to take care of – a jetski fix-to-sell
project, a 4wheeler fix for a friend, a lawn tractor fix… There’s no shortage
of work to be done out in the garage.
Me, I’ll just keep on waiting.