header-photo
Showing posts with label exterior trim. Show all posts
Showing posts with label exterior trim. Show all posts

Labor!

Yes yes yes. I know Labor Day is supposed to be about relaxing, spending time with friends and family, and all that yadda yadda. But - if you're a psychotic home improvement junkie like me, you really get your kicks by completing weekend projects!

Let me tell you about my Labor Day. First off, I woke up a little angry because I slept through Discovery Channel's "Collassal Squid" show. Second off, I woke up super early. Like 6:30am kinda early. Not the normal start to a normal relaxing day off - again, I'm not that normal.

So I got up, went for a walk, came back, showered, and got to work. Mike was still asleep of course. It was still only 7:30. But by the time he got up at 9:30, I had already second coated the exterior window trim on the porch side, second coated the french doors, and painted half of the garage top - as far as I could reach from where the scaffolding was placed. Three coats!

Mike was nice enough to help me move the scaffolding right out of bed. And then we both got to painting the other half. He got all the high parts, of course. Before noon, the garage was done!

Before

After

Then we moved on to attaching those upstairs railing balusters that we had left unattached for so long. That was a little tedious and took us right up until lunch time. We took a short lunch break and then moved on to the basement!

If you remember our "Lean Mean Cleaning Machine" post - back on 4th of July weekend when the summer started (OMG has it been an entire summer?!) we cleaned out the garage and put all the home improvement related tools in the basement - creating a huge mess down there.

But it was an organized mess, with piles for plumbing, carpentry, electric, etc. All we had to do was build some additional shelves and put everything away neatly. So, we used a bunch of scrap wood and made the most makeshift shelves you've ever seen. I told Mike they looked like sketchy bunk beds. But they were pretty sturdy. And here's how everything looked when we put it back:


See, previously we had only had that smaller shelf on the left and we added the long part on the right. And all the stuff fits beautifully! I couldn't have asked for more... except perhaps a couple more storage boxes. All in good time.

After that was done, we were able to vacuum and clean up everything else down there, making room for all the extra porch lumber, which had been sitting outside for over a month.

Ah, the lumber section.

And Mike brought up an interesting point. We probably have enough extra wood to frame out a basement bathroom. "We should make a bathroom down here before we even think about doing the upstairs bathroom," he pointed out. A valid point. With only one bathroom - tearing down your bathroom leaves you toilet and showerless. I had half a mind to start him building on it right away...

But there's a roof and siding to consider. So this one may just be as well off left to the list of winter projects. Fall's agenda is just too long to list!

Lastly, as night fell on Labor Day, we installed the railing to the basement stairs... or at least half of it. (It's a split railing, and we don't have the bottom newel yet to attach the bottom part to.)

All in all - a very productive, non-relaxing labor day. And I wouldn't have wanted it any other way.

Give or take a few thousand monkeys, a few thousand typewriters...

The theory states - if you put a few thousand monkeys in a room with a few thousand typewriters and give them unlimited time - they'd eventually write the works of Shakespeare - purely by chance.

The same theory should apply to home renovation by non-professionals. Give or take a few thousand projects, you'll eventually do something right - purely by chance.

Every time we talk to one of our carpenter friends, it's "Well, you're not really supposed to do it that way." or "You're really supposed to use this..." or "It would have been easier if you had..." I guess we haven't hit that magical random project that turns out beautifully perfect by pure random chance.

It was the same story last night. Mike had some questions, and called up a friend of ours, who immediately had changes for us to make to the work we did last weekend. Small changes, mind you. We're usually not too far adrift on the sea of can't-turn-back-now. He also had some advice for this upcoming weekend, as we want to continue to press forward and get as much accomplished as we can - without starting to frame out the porch. (That is not a job for un-professionals, especially when inspections are on the line.)

So he's going to come by tomorrow morning to provide some much needed guidance. I'm not quite sure what's happening yet - something to do with some 2x10 or something that goes... somewhere. I paying about 2% attention to Mike as he was trying to tell me. I was so out of it last night.

2% Attention - great band name. As apposed to Skim Attention and Whole Attention. First album: "Crying Over Spillt Attention"

And I guess we can finish that window trim in the kitchen... and put up the exterior trim on that one mudroom window. And if it doesn't rain I could always start repainting the exterior window trim.

I have to admit, I'm not very enthusiastic about the approaching tomorrow. The forecast calls for a 60% chance of poopiness with mostly gross skies and temperatures low in the depths of the sweater drawer. That, coupled with the fact that bills and a trip to BJ's have stripped us of our stimulus money... it's got me feeling like I should just crawl in bed with a bowl of cookie dough and watch cartoons for 48hrs straight.

Mike would stab me if he saw me doing that. I'd have to lock myself in.

I'd like to start tiling in the mudroom - my dadoo has already agreed to help. (He also did our kitchen tile - which I get more compliments on then anything else.) But I feel like I shouldn't spend anything not exterior-related, since I have that big 'ol list to fulfill.

And I have to keep spending religiously on the exterior if I intend to have it all completed by the end of summer. I can't be cheap because every weekend is precious.

Stay tuned - I don't know what's going to happen next.

A Late Start to a Long Day

Saturday - the final frontier.

And Mike and I totally slept in after holding a little going away party for one of our friends on the previous night. We didn't even get moving until around noon, believe it or not. And even then we were still moving around pretty sluggishly.

Nevertheless, it was with a heavy heart that we took the old side door and mudroom windows to the dump... NAH, just kidding. That was awesome. Goodbye seashell door knocker. Goodbye energy deficient windows. Goodbye to that stupid awning thing over the old door. And good riddance to all.

We got home, feeling a little more motivated, and measured and cut the exterior trim for the new windows. Then we gave them a coat of paint.



While waiting for the paint to dry, we quickly installed the doorbell and exterior light that we had moved the wiring for when we moved the door. (Read that sentence at least three times to fully understand.) That didn't take too long, so, while all the electrical tools were handy, we installed a new light in the basement stairway and wired it to the switch.

We had at first wanted the stair light and the basement lights to come on at the same time with the same switchs. But, finding the wiring very very very confusing, (two switches, two sets of lights, two feeds, and a partridge in a pear tree) we just decided to make one switch turn on the stair light and one turn on the rest of the lights. It seemed to make more sense for future anyway. So we did that.


But once the light was on in that basement stairway, it illuminated a big problem. The drywall looked like crap. Having previously been a closet, the now stairway had not received very much care and attention from the drywallers. And now lit up for all the world to see - it was rather pathetic looking.

Plus - remember that big 'ol hole in the hallway where the under-stair closet used to be?
(Here's a pic from last summer - notice, that space under the stairs is still a closet.)

Well - that was now a giant hole, as you can see from this more recent pic.

I pondered a lot of your suggestions while thinking of what to do with such a hole and finally decided to make shelves on the inside - ie, the basement stairs side. Thus providing a secret space for secret nick nacks or tools or whatever. It just made more sense than shelves on the other side, which would be at your feet. That just seemed silly to have to bend down to look at whatever was on them. Plus, we'd have to create a cat door in the same hole so our two cats could get downstairs.

Wow, tangent. Anyhoo - those were the problems at hand. Also, at this point it was late in the day - maybe around 5pm. But nevertheless (can you believed I've used the word 'nevertheless" twice in here? Unbelievable.) NEVERTHELESS (3, had to do it.) Mike wanted to go down to the DeepHo for drywall.

Again, I was not one to stop the motivation train. Plus, I had about $9 on a gift card leftover from a return. So I figured, what the heck. We went down, picked up some stuffx, and started working as soon as we got home. Mike started in on the drywall while I gave those window trim pieces another coat of pain... I mean, paint. Hahaha.



Mike was still working when I finished the painting.

"You know what," he said, "We should really paint that bathroom ceiling."

Hmmm, I thought. He was right. It was brown in spots and disgusting. So I took the exterior paint I had been working with, grabbed a roller, and started painting the bathroom ceiling. But once I had most of the ceiling done, I was frustrated. Now the stark white bathroom walls looked mismatched against the cream colored ceiling. So I took everything out of the bathroom and started painting everything - the walls, the trim, the door - everything that looked dirty or gross or white, I painted.


Then I unscrewed and took down the old metal shower curtain rod that we didn't use. (It was too short for Mike, so we had a spring loaded one up.) And while I was painting the window trim I noticed a piece of tape under the window. Of course I thought, I'm going to take this tape off. Little did I know it was holding a couple of tiles on... which came off with it. I showed Mike and he laughed and came in to the bathroom and ripped off one of the stupid towel bars that I hated.



After that, Mike continued on the drywall - hanging all of the oddly shaped pieces. He also made my shelves and the cat door hole.



By the time we both realized we were hungry, it was around 10:30pm. Luckily, I had some leftovers, which we heated up. After that, the paint in the bathroom was pretty much dry and I was able to put everything back. Mike was done hanging and ready to sand, but didn't want to fire up his loud palm sander at 11:00 at night. So we went to bed.

And that was Saturday.