Floors, Pipes, and Blizzards

Hola, blog-readers! Lots of excitement round here... so much so in fact that I haven't even had time to type out two sentences about it.

Two weeks ago now, we completed flooring and plumbing in the bathroom.  (Well...Save for one mysterious disappearing valve that we cannot for the life of us locate...) On that particular Sunday, we were at the home depot once again for supplies - the sink and shower fixtures, plumbing parts, etc. And I really wanted to get the flooring taken care of.

Even though we're not a fan of it, we went to check out the stick-on flooring. (This bathroom is only semi-permanent after all.) And wow! Cheap cheap cheap! $30 for a box of 12x12 stick on tiles that would cover nearly the entire bathroom floor. (Compare this to a good quality 12x12 tile at over $5 a tile!) We bought two boxes to have plenty - plus plenty of extra.

After a bit of cleaning, we got to sticking. And in less than two hours we went from subfloor to finished floor. Can't get that with tile either.

Flooring by the Shower

In Process of Flooring

This is how it will look when finished!
Of course, less then three weeks later and already a couple of the tiles are un-sticking themselves from the subfloor. But we don't even care. Slap some glue on the corner and stick something heavy on it... It doesn't have to last forever.

The next day, Mike was onto the plumbing...

Sink Plumbing - Note missing valve on the left hand side there.

Shower plumbing


Mike also completed as much drywall and insulation as he could considering that we still have a leak in the roof. As you can see, one side of the room and ceiling are all set... the rest, not so much.

  

The entire plumbing job was a royal pain and we had to lose an outlet in the kitchen to fit the shower pipes in there. (Kitchen is right on the other side of that 2x4 you see under the shower mixing valve.... there was an outlet right there.)

But the job was finally done - no leaks - all good. Then we got hit by Blizzard Nemo and were buried under 2-4' of snow. The blizzard hit us last Friday, we lost power Friday night, and didn't get it restored until late Monday night. Needless to say, there was nothing done last weekend... except for a heck of a lot of snow moving, skid steere rigging, snowmobile breaking, generator moving, couch sleeping, wood stove loading.... You get the idea.

And to make matters worse, all this snow is going to severely delay the leak-fixing that we had planned for upcoming weekends. A lot of the bathroom side of the house needs to be re-shingled in order to fix that leak. And we can't move forward with any more insulation/drywall until the leak is fixed. So as you can imagine, we're quickly going to run into a stopping point.

This weekend we may be able to get the shower enclosure up and another few bits of drywall....

Happy What?

La la la la - WHAT? 2011? Shoot.

Sorry, I've been totally MIA for about three weeks, preparing for xmas and for the annual family trip to Baltimore. (From which we returned just last night.) Oh, and yeah, there was a giant blizzard in the middle of all that. Throw in a buncha crazy deadlines, the stomach flu, the common cold, a toddler, traffic, and an unnatural love of bananas.... and boy you've got a stinky Christmas stew bad enough to send even the most devout Christmas fan to sheer insanity.

DUDE - ok, the ad just came on TV and I'm pissed. I bought a chicken sandwich at BK yesterday and did not get one free. Dam you jersey turnpike!

Anyway, needless to say, I'm glad to return to reality... whatever that is. Honestly, I need another vacation. Say... ME... on a cushy lounge chair.... next to a pool... in 85 degree temps, light breeze... and, oooo! Bay Breeze! In my hand, pink umbrella, bendy straw. No such luck, welcome to 2011 - it's still winter in New England and we've got things to do.

The boys did some work the weekend before Christmas. Mike had some of the guys over, plus Timmy, to help him with the siding on the kitchen/mudroom side. (Ahhh, as I recall now, this was the day I got the stomach flu.) But despite my incapacitation, the four-five guys made amazing progress within an amazingly little amount of time. When I peeked out at them around 1pm, they had already stripped the shingles off the mudroom, removed the temporary tar paper from the kitchen side, stapled up TvVek, and installed siding up to the bottom of the windows.

The most amazing part - the kitchen/mudroom were now one cohesive side! Not one side with one tacked on addition. The mad plywood leveling was paying off big time!

Unfortunately, that was the last thing I saw before I was totally bathroom bound. BUT - when I was feeling better, I saw that Timmy and the guys had continued until they were at the top of the mudroom windows. It looked incredible! Our house suddenly is looking like a really nice house...



Just today, Mike cleaned up that side and continued siding - all the way to the top of the kitchen window! He's left some of the difficult cuts for Timmy, who should be by next weekend. And don't think I've forgotten about the porch... Hopefully we'll have some snow melt by that time too.