header-photo
Showing posts with label organizing. Show all posts
Showing posts with label organizing. Show all posts

How To New Kitchen In Less Then 3 Weeks. The End.

I have been completely and utterly out of control for the last week. Yes, for some reason, I suppose I had gotten used to chaos…. so when the chaos suddenly ended, I was lost and confused, running around not knowing whether to scratch my watch or wind my butt.

The kitchen was completed last Friday – but basically done on Thursday minus the cabinet hardware. I remember walking in the house after work Thursday night… it was literally one of those HGTV “Big Reveal” moments. I had seen the layout. I had seen all the cabinets going in. I had seen the MDF countertop form. But to see the real countertop on those cabinets… and all the doors and drawers on… the sink in…and all the appliances in place. It was amazing. Drop dead gorgeous, I can’t believe this is my house, this is a rich person’s kitchen amazing. After our installer left, Mike and I just stood there like idiots, marveling over it. We were both blown away.



 The light colored countertop brightened the entire room and complimented everything – the cabinets, the floor, the appliances, the sink… And I just knew all my red accent pieces (toaster, knives, Keurig, etc.) were going to really pop against it. Not only that, the entire countertop was seamless – even in the corners! And the backsplash went up on the wall much higher then our old one. The countertop also butt right up to the stove, so no more dropping massive quantities of foodstuffs down there with no means to clean it up. It was awesome.

The sink fit so much more easily in our  new cabinets too – no more too-big stuffed-in-there look with no room to clean behind it. Now we have countertop behind and in front of the sink for easy cleaning. Plus, the sink light, which was always off-center above the sink is now truly centered! (You have to remember, we made yard sale cabinets fit the space, so we’re lucky the light made it in even the right vicinity the first time.)

The weird corner by the fridge where the old window used to be is finally looking like “part of the kitchen” instead of “a weird corner where a window used to be.” The upper cabinets on that side work perfectly, despite my hesitation at getting them. And the extra counter space on that side makes the whole kitchen look bigger, as it creates a better flow. (A U shaped, circular flow, if you will.) The large fridge finally looks like it was meant to be there, instead of a huge-ass fridge somebody stuck in a super small space.

Our stove, if you recall, we moved over about the space of one cabinet, at the suggestion of our designer. This too, I was unsure about, since I didn’t want to lose any cabinet space. But I’m so glad I followed his advice. Again, this one small change, a little tiny move to the left, makes a huge difference in the overall flow of the room. Before, the stove was too close to the fridge and, again, boxed in that weird old window corner. Now, the two appliances have room to breathe, and there’s still a ton of cabinet space, especially with the new above-microwave unit.

We are 100% satisfied. Expectations exceeded by leaps and bounds. Mike told the dude straight up, “You’re the only contractor we’ve ever had in here who did a great job.” And it’s true. In fact, he went above and beyond, taking his time with every detail of the installation. Everything is perfect. Perfect! There isn’t a thing out of place, and no compromises and no excuses (“Well,  X and Y aren’t working so we have to do Z instead.”) and no extra monies or materials or anything needed… And no mess to clean up afterwards. Our experience was unbelievably good.

After we got over being completely dumbfounded in our new kitchen, Mike and I re-installed the track light, re-moulding it to fit the new space so that lights shined now in both corners as well as across the front. (We ended up only using four lights out of 5, which is perfect since I broke #5 while cleaning back around Halloween.) We also put back up some of our wall décor. Mike, seemingly inspired by the meticulousness of the kitchen installation, took the time to measure and properly center everything too.

Last Friday, the hardware and bottom trim installation was complete, thus completing our kitchen renovation. You’d think after our installer said, “It’s all yours!” I would have gone gung-ho, replacing and reorganizing all the foods and dishes in the cabinets right away. Nope. As soon as those words were uttered and the door was shut and the van was driving away… My brain turned to mush.


 I began putting a few things here and there, but felt mostly like an overwhelmed zombie. Saturday wasn’t much better. Again, I continued to put away more stuff,  but felt scattered. Thankfully, I had somewhere to be in the afternoon. I needed a mental break from lack of chaotic activity. Sunday, Mike spent most of the day installing and re-plumbing the sink and dishwasher. We ran into a few hurdles, some leaks, some bad hose, a minor flood… the normal stuff. By the end of the day – and I mean truly the end because we had a hose go bad when I finally tried to run the dishwasher around 6pm – everything was back to normal and functioning well.

But the return of the sink F’d me up for an additional day or two. Knowing the day was soon at hand, I’d let dishes just sit for a while. So there were a lot of them. And we had run out of paper plates. So there were plates too now. If I can manage to put away dishes from the dishwasher tonight, I may be finally caught up after 4 days.

And at this point, everything is finally put away and organized after all the picking away at it. I think I did a decent job of figuring out the  most efficient arrangement. (Took me long enough though.) The plates/bowls are over the dishwasher for easy putting away. Pots, pans, bowls, and frequently used small appliances are in the lower corner next to the stove. Infrequently used items like good china and fondue pots are in the upper corner next to the fridge. Food items are mostly in the lazy susan next to the fridge with additional small and canned items in some of the upper cabinets around the stove.

The cutlery is below the cutting board work space. The trash cabinet is right next to the cutting board work space for easy cleanup during food prep. The trash bags, plastic wrap, etc are all in the cabinet next to the trash cabinet. The old trash can is out. (Let me say, it took us a few days just to transition to a new trash can… that’s how messed up I was.)

The cups and mugs are back where they were originally… and believe it or not, we have unused cabinet space. AND – all that bulky BJ’s food and potato/onion containers that previously had to be stored on top of the fridge because they didn’t fit anywhere else?! They all fit in this kitchen. No lie. The lazy susan is big enough to handle large and bulky items with ease. My only gripe is that items in the lazy susan must be arranged so as not to bump the hinge mechanism of the door. That’s a little bit annoying, but in no way am I dissatisfied.

The only other small inconvenience – my ice cream machine does not fit under the cabinets anymore. But that’s ok… because it fits in the cabinet with all the pots, pans, and other frequently used items.

We now have trim at the base of the cabinets, whereas before we had none and the grout from the tile was splattered messily on the bottom of the old cabinets. The hardware looks great and coordinates well. I just can’t say enough good things about this kitchen.

And here on Wednesday, I think we’re finally close to enjoying it. We have to clean the floor of all drywall mess… do those last remaining dishes… and reinstall the bag holder and pot lid holder.

How To New Kitchen In Less Then 3 Weeks. The End.

Inspiring (Though Temporary) Fix

We were at Bike Week last week... Great time, terrible weather, by the way. And while we were gone, Mike's mom (Kathy) was at our house watching out for both Mikey and our two cats. Cool, right?

Well, I returned on Wednesday evening to a few surprises. First, Kathy had totally organized the toys in the living room, with two new shelves, a canvas bin, and a new little table. Now, Mikey can clean up and put away his toys and they'll actually have a place to go.... Then Kathy says to me, "Now look in the bathroom."

Woe. The second I opened the door I was blown away. She'd accomplished something that I'd been thinking of doing time and time again for the better part of six years. She bought a roll of that cheapo linoleum and laid it down on the bathroom floor. It looked AWESOME. I mean like, exceeding any of my cheapo-linoleum expectations awesome. Plus, she got an actually toilet paper roller to go in our built-in holder and a new shade, which she had trimmed with some pink fabric trim to match the rest of the room.

Now, before I post pics, let me tell you just how inspiring this was. I decided just yesterday that this new and clean/fresh bathroom needed to be re-organized. So I started re-arranging all the crud. The four yaffa blocks I had serving as a vanity cabinet (leftovers from college), I moved to next to the bathtub. Nah - that just wasn't going to work. I moved them back. "I just wish these things were thinner," I thought.

Then, I had an epiphany.

Down in the basement, I had two thin plastic rolling drawer cabinets (also leftover from college) that I knew were practically empty. I measured them. I measured the space. This just might work. So I emptied and cleaned them and brought them in to the bathroom. This was going to be good - as long as my towels from the yaffa blocks would all fit in these smaller cabinets. I cleaned out the yaffa blocks and folded the towels.

They fit.

In fact, I had extra room and cleaned out my other bathroom/medicine cabinet, putting some of the bulk purchase items and annoyingly inconveniently sized items (hairdryer and curling iron) in the new cabinets as well!

I only wish I had a proper "before" picture for you. In fact, the only wide shot of the bano I could find on this blog was from 2005. And believe me, it looked much worse now in 2011 then it did then. Let me paint you a picture - the floor was dark green very old linoleum. (or something like that) It was cracked, warped, water damaged, rippled, and breaking all over the place. You'd leave the bathroom with gross pieces of flooring stuck to your feet. Of course dark green gross linoleum matches the light pink tile and teal green bathroom fixtures...not. The shade we previously had was a "temporary" shade made out of paper. Yes, paper. Costs like $2.00 at your local home improvement warehouse. The vanity cabinet, as I said, was made out of two stacks of two yaffa blocks, which didn't exactly fit well under the sink due to the plumbing. The yaffa blocks were made to look as one cohesive unit with a decorative towel draped on top and two cheap kitchen curtains hung across the front on a curtain rod. We kept the TP on top of the yaffa blocks and not in the TP holder because we didn't own a roller. (Hard to believe my husband works at a hardware store.... but I just couldn't spend money on this sh*t hole.)

Now, with all that in mind.... check this out:



In the pictures, the cheapo stuff looks nearly real. The real life view isn't quite as real - but it's 250% better then what it was before. The entire room is so much lighter now... easier to clean.... better on your bare feet.... It's still terribly ugly - but at least we can live with this now until we can manage to redo it for real.

Later on yesterday afternoon I cleaned up and organized the storage in the basement using the yaffa blocks. So that's looking more organized as well. All at NO additional cost. (Love that part!)



I can't wait until we can re-do that basement and get our other bathroom going on down there. But for now, of course, it's summer. And outdoor projects need tending to. Mike will be home today, and rumor has it, our neighbor will be over next week to finish the kitchen drywall so we can paint and trim out the new (now sorta old) window. Next Sunday, Timmy is raring to go on railing installation... After that, steps. After that, siding the other side of the house. After that, (pending funds) new gravel in the side driveway and a fence for the backyard.

That should get us through the remainder of summer.

In the Glass of Her Boudoir

Boudoir - French, literally means "sulking place." I'd like to think of my all-new office as a boudoir. Yes, you heard it here first, all-new. As in, I'm sick of sitting stagnant and couldn't live in the virtual photoshop renovation world any longer. I decided to re-arrange my upstairs office.

It had been annoying me for quite some time - ever since I started my piano lessons and found I couldn't get at the keyboard comfortably with three computers, a TV, a sewing machine, and various pictures, nic-nacs, and other oddities all over the desk. Plus, the excess dust and garbage was highly aggravating to look at. I mean, I had old empty boxes of nothing, giant dust bunnies, a file cabinet from the dump, and wires - wires everywhere! Oh, and the books! Tons and tons of books!




 This is what happens when you have a little boy and don't use your office for near to two years.
It was high time I stormed the castle and regained my place on the office-throne.

As usual, I highly underestimated the time it would take me to do such a thing. Two hours tops. Four hours later and I still wasn't done. I'm actually still not done. It took an additional two nights to clean up the major mess and now I need to organize the minor mess that still remains.

Why did it take so long? Well, I suppose I should have gone back to photoshop land first, because I rearranged that room every which way to Sunday. I knew I wanted to flip the desk around so the chair would face the wall instead of facing out. But beyond that - uugh!

I flipped the desk and centered it. I flipped it and put it to the left - the right - back to the left. Measured to determine if it would fit on another wall. And finally I flipped it so it faced the window. Now, I thought, I was on to something. The rest would be easy! WRONG. Where to put the couches? I can't even tell you how many couch configurations I did. This was the bulk of my time. I moved those things again and again and again. Finally, as the sun began to set, I said, "Come on, think outside the box here." And that seemed to work - I put the large couch in the middle of the room.

Now I was really onto something! All of a sudden I had two defined areas, which solved the problem of a big freakin gap in the middle of the room.

But the love seat was still a problem. I wanted it to fit opposite the couch, but it was just too big for the space. I needed a chair. I didn't have a chair. I needed to buy a chair.

And that pretty much brought me to the end of Day1.

On Day2 I left the dang love seat where it was and brought in all the misc items I had stuffed into the bedroom on Day1. Books, video equipment, nic-nacks, etc.

On Day3 I went into HomeGoods to check out their chairs. I had previously looked online at IKEA and decided I didn't like anything there for the money. I planned to check out HomeGoods and take some measurements and on Day4, get an armchair for around $200. But - I had a total Maxx moment. They had, in the back, a perfectly matching chair... same color as the couches, microfiber, very soft.... on Clearance - $75. It didn't have any arms, but for a price like that, I didn't care.

I brought it home at put it in place of the love seat. And unfortunately I had to stick the love seat on the other side of the room temporarily. I need to get it out of there, but since it won't fit thru the living room basement door, I have to wait until the temps warm up enough for us to open up the exterior basement door.

Final thoughts - the chair could be bigger, but for the money, I think it's great.


Labor!

Yes yes yes. I know Labor Day is supposed to be about relaxing, spending time with friends and family, and all that yadda yadda. But - if you're a psychotic home improvement junkie like me, you really get your kicks by completing weekend projects!

Let me tell you about my Labor Day. First off, I woke up a little angry because I slept through Discovery Channel's "Collassal Squid" show. Second off, I woke up super early. Like 6:30am kinda early. Not the normal start to a normal relaxing day off - again, I'm not that normal.

So I got up, went for a walk, came back, showered, and got to work. Mike was still asleep of course. It was still only 7:30. But by the time he got up at 9:30, I had already second coated the exterior window trim on the porch side, second coated the french doors, and painted half of the garage top - as far as I could reach from where the scaffolding was placed. Three coats!

Mike was nice enough to help me move the scaffolding right out of bed. And then we both got to painting the other half. He got all the high parts, of course. Before noon, the garage was done!

Before

After

Then we moved on to attaching those upstairs railing balusters that we had left unattached for so long. That was a little tedious and took us right up until lunch time. We took a short lunch break and then moved on to the basement!

If you remember our "Lean Mean Cleaning Machine" post - back on 4th of July weekend when the summer started (OMG has it been an entire summer?!) we cleaned out the garage and put all the home improvement related tools in the basement - creating a huge mess down there.

But it was an organized mess, with piles for plumbing, carpentry, electric, etc. All we had to do was build some additional shelves and put everything away neatly. So, we used a bunch of scrap wood and made the most makeshift shelves you've ever seen. I told Mike they looked like sketchy bunk beds. But they were pretty sturdy. And here's how everything looked when we put it back:


See, previously we had only had that smaller shelf on the left and we added the long part on the right. And all the stuff fits beautifully! I couldn't have asked for more... except perhaps a couple more storage boxes. All in good time.

After that was done, we were able to vacuum and clean up everything else down there, making room for all the extra porch lumber, which had been sitting outside for over a month.

Ah, the lumber section.

And Mike brought up an interesting point. We probably have enough extra wood to frame out a basement bathroom. "We should make a bathroom down here before we even think about doing the upstairs bathroom," he pointed out. A valid point. With only one bathroom - tearing down your bathroom leaves you toilet and showerless. I had half a mind to start him building on it right away...

But there's a roof and siding to consider. So this one may just be as well off left to the list of winter projects. Fall's agenda is just too long to list!

Lastly, as night fell on Labor Day, we installed the railing to the basement stairs... or at least half of it. (It's a split railing, and we don't have the bottom newel yet to attach the bottom part to.)

All in all - a very productive, non-relaxing labor day. And I wouldn't have wanted it any other way.

Fed Up Fri

This has been a lightening fast week.

So why the hell is time moving at 25% speed today of all days? Of course I'm not helping matters by checking the clock every 2.2 seconds.

I just can't wait for the weekend - and once again, oddly enough, I'm really looking forward to going to the dump. Sick, isn't it? But we have to get rid of the remainder of our garage trash before we can call that project officially completed.

Oh, and we also have to put up the hanging tools hooks I bought for Mike over the week. You know, a place to hang the shovels and the rakes and blah and blah and etc. That blah and blah and etc are always getting in the way, you know?!

Then there's that basement mess... but that might be a Sunday project. Saturday the guys will be over to frame out the porch ceiling.

And would you believe that's it? That will be the end. You probably are asking, why? Well, despite the fact that we still have money in the hopper, the siding and the roof just take priority over trimming out the porch.

What a bummer. But nothing I can do about it. Fall is fast 'a coming and there's still so much to do!

Lean Mean Cleaning Machine

Ah, 4th of July weekend. Time for beaches, bbq's, boating, fireworks, friends, fiestas, and garage cleaning.

That's right - garage cleaning.

For quite a while now the garage mess has been annoying me to no end. We can't find stuff when we need it, we think we don't have something so we buy it and then we find out we already had one, carpentry tools are mixed in with mechanical tools and plumbing tools are mixed in with building materials, and so on and so forth. Plus junk and trash and dirt - EVERYWHERE.

It was so bad, you couldn't even walk through. You couldn't even look at it, it was terrible. I said to Mike, I don't know how you can work in here if I'M this annoyed. I just couldn't imagine how he could accomplish anything.

So with the guys on vay-cay from porch work, I told Mike that Sunday was the opportune time to get this mess straightened out. He did not want to spend a day cleaning - but agreed that it was long overdue and we needed to do it.

We employed the HGTV method I learned from watching countless hours of Mission Organization. It's basically a five step process.

1. Remove EVERYTHING from the garage.
2. Separate into organized piles of like items - plumbing tools, building materials, trash, liquids, straps 'n chains, garden tools, stuff-that-should-be-in-the-house, etc.
3. Double check each pile - get rid of anything you don't want or need and consolidate. (For example liquids like oil if you have a million half empty containers like we did.)
4. Clean the now emptied garage and decide where everything is going to go.
5. Put it all back neatly.

Additionally, we had some other challenges. You may remember that our homeowners insurance company had a problem with that wood stove in the garage - so we had to remove that using our skid steer and get it down in the basement. (Using some straps and a plywood stove-surfboard mind you.) Also, our two car garage has just one door. No, not one big door. One small door on the left side. Well, eventually we'd like to put in another door, so we decided to make ready for this by moving Mike's tool box and bench to the opposite side of the garage where the stove once was.

We decided too that to help keep the garage clean, we would store all non-mechanical, non-garden tools and materials in the basement. This includes all carpentry, plumbing, electrical, and paint (non-automotive) supplies, tools, and materials. Unfortunately, we only have one shelf in the basement currently. Not enough storage space by far. And in the interest of time, we decided to leave new-shelf-building for another day. (By the by, we have so much scrap wood, we should be able to build more shelving without purchasing anything but storage boxes 'n stuff.)

So the basement is currently a mess of organized piles. I guess you could call that halfway there. When we get the shelves built, all we'll have to do is put stuff away neatly.

Luckily, we had time to make one dump run - and boy did we get rid of some junk! Phew, what a relief! Next weekend, we'll have to make one more dump run to finish the job. (Dump closes at 3pm, so we weren't able to get everything.)

Now at this point I'm sure you're all wondering, "Where are the before and after photos?"
Well, would you believe I didn't take any before? I was just too horrified by the mess. But I'm so proud of the after that I just want to hang out in the garage all day! Isn't that crazy! Although the basement's mess is going to start cheezing me off soon if we don't get those shelves built....

A little hard to tell the clean with all the bikes in there - but trust me, you should have seen the before!
Here's where the 2nd garage door will eventually go. Now we're ready for it with the bench moved!
I've never seen these shelves so clean since we bought the house. OMG it's amazing!

And finally, the bench area. There's a place for the bench, and the red tool box fits next to the compressor, and the welding cart has a place... so amazing!

I can't wait for the guys to see it next weekend!