New Year, New Window

Well the holidays are over and the house is all cleaned up of all holiday decorations. So, in honor of this newfound cleanliness, what we do but start tearing stuff apart again?

Sunday Mike started in the old bathroom soon-to-be new bathroom by going downstairs and completely leveling out the floor. (When we put the vanity in there - not to install, but just to store it - we couldn't help but notice that it was leaning drastically.) Mike removed one of the old beams underneath and created a new one, carefully shimming and leveling as he went.

Monday we made our list - checked it twice - and went to the Home Depot yet again. (And this time we kept our distance from the shower department.) We bought the first round of construction materials - rafters for the ceiling, strapping for the walls, a new window, electrical boxes, a bathroom vent/fan, a fan duct, and a whole buncha LED christmas lights that were 75% off. (Two guesses who picked those out - chaching! $6.99 for a 17' long outdoor LED icicle light set is a dang good deal in my book. I bought four!

When we returned home, know what time it was?! WINDOW TIME!

One of the things I despised most about that old bathroom, (and I use the term lightly because I despised many things about that bathroom) was the window.


Here is a photo of the bathroom in what was probably its best, cleanest state. Note the location of the window in proximity to the toilet. IT'S RIGHT THERE. Know what's right outside that window? Our neighbor's house. Our neighbor who likes to come over a lot and walks right past that window to get to our driveway. No me gusta.

So I always had to have a shade covering the window... which made the room incredibly dark and even less appealing.

To keep things easy, Mike wanted to simply replace the old window with one of the same size in the same location. I said, "No way!" And after a bit of discussion, (since there is no other wall that the window could go on and no possibility of totally rebuilding the bathroom) we agreed on a smaller window of close-to the same width. It would be placed at the top of the old window frame and Mike would rip off the exterior old siding and replace with shingles. (Since it's such a small wall, time and cost expenditures would be minimal.)

Now onto - WINDOW TIME!


First, cutting the hole. Mike removed the old siding and even older shingles underneath the siding. Then, he removed the old window.


Next, re-ply. Mike put up new plywood on that entire side of the bathroom. (Which isn't very much room at all - we had enough plywood in stock to take care of it easily.) Then, he stapled up tar paper over the entire wall.



Now, time to cut a new hole. Mike cut and framed a space for the new window, which as you can see, has a bit of a different location then the old one. Keep in mind that to the left of the window, on the outside, is where our chimney is. We couldn't go any more to the left. So, since the new window was winder then the old window, we went right and left the chimney with plenty of breathing room.


And finally, by the end of the evening, the new window was in! We couldn't be happier with its location. You'd have to really make an effort to look through this one to see someone in the bathroom. (Although for showering purposes, we will still likely put up a shade.) But it's still enough to let in lots of light... probably more then that dirty old window did, even at twice the size.

Next up - new ceiling rafters, wall shimming, and exterior shingling on the new window wall...



That's a Big 'Ol Bathroom

Progress continues! Here, not even a week into this bathroom project, and three out of four walls are completely framed – vapor barrier up. The two doors, including one pocket door kit, have been purchased. And that 4th wall? Well, it would have been completed had Mike not run out of wood.

Next step - obviously, more wood. And I think it's time for the fixtures... (I'm looking forward to arranging things BEFORE plumbing them in.) 

Thanks Indeed

Turkey Day. A time to remember how thankful we are for family, friends, food… employment. And a big fat check from the MG guy! He’ll be here the first full week of December to load it up and take it away – thus ending our long long journey with that little red monster.

With money in hand, we were quick to disperse it. Mike paid off his friend for the purchase of his motorcycle. I paid off the credit card and repaid our savings for paying the credit card. I also paid off the fridge on the DeepHo card, bringing us back to a $0 balance on all fronts once again. What a great feeling! Much of the pressure we’d been building up over the past few months was gone immediately.
And, with our new found financial and obligatory freedom, we got right back to work on the house. I put up the tree and all the Christmas décor on Black Friday. (Staying as far from stores as humanly possible.) Mike picked up the Pex for the radiant heat on Saturday. Sunday, we really got down to business.
We didn’t get started until after lunch. (Notate that.) Then, Mike drained the heating system and disconnected the pipes downstairs. Upstairs, I moved the furniture in the kitchen and mudroom and disassembled the baseboards in both rooms. Then, it was off to the DeepHo for strapping and 2x6’s.


Upon our return, Mike quickly nailed up the strapping underneath the mudroom and drilled all the Pex tubing holes. Then, the difficult part. We both unrolled and tugged and pulled and fed and twisted and pulled and tugged and connected the tubing in and out of the floor joists. Not as easy as it sounds, since the tubing isn’t so flexible when hot water isn’t running through it.


We removed both baseboards from the kitchen and mudroom and put the former mudroom baseboard into the kitchen. (Wow, this means we finally can have an end-cap in the kitchen… no more no-name brand baseboard that we can’t find the ends to.)
And finally, around 6:30pm, Mike reconnected all the copper connections and pressurized the system. Kudos for re-using so many fittings too… although I wouldn’t advise doing such a thing. We had a couple leaks on first pressurization, but they were quickly fixed and the system was working beautifully by 8pm.
The whole job is made even more unbelievable when you take into account that we had to clean out and move just about our entire stock of lumber – which was all in the absolute worst spot ever. We had to remove it all from the saw horses, stack it, move the saw horses, and then put it all back on. What a pain in the butt… but good in helping us take stock of what we have. Lots of good sized trim pieces, for example. Plus, it was good reason to get rid of all the too-small or crappy bits. We threw those out the window.


Of course, that left us with a big mess outside to clean up at 8:30 at night. We were so toast, tired and achy at that point, but managed to clean at least the driveway.
And all those 2x6’s we also bought at HD? I bet you were wondering what those were for. Bathroom, baby, bathroom. Mike will begin framing TONIGHT. Boy, are we going to push forward with this one. It’s a Christmas gift to us and long time coming at that.

TUESDAY MORNING UPDATE:
Most of one wall is up!

Labor!

Yes yes yes. I know Labor Day is supposed to be about relaxing, spending time with friends and family, and all that yadda yadda. But - if you're a psychotic home improvement junkie like me, you really get your kicks by completing weekend projects!

Let me tell you about my Labor Day. First off, I woke up a little angry because I slept through Discovery Channel's "Collassal Squid" show. Second off, I woke up super early. Like 6:30am kinda early. Not the normal start to a normal relaxing day off - again, I'm not that normal.

So I got up, went for a walk, came back, showered, and got to work. Mike was still asleep of course. It was still only 7:30. But by the time he got up at 9:30, I had already second coated the exterior window trim on the porch side, second coated the french doors, and painted half of the garage top - as far as I could reach from where the scaffolding was placed. Three coats!

Mike was nice enough to help me move the scaffolding right out of bed. And then we both got to painting the other half. He got all the high parts, of course. Before noon, the garage was done!

Before

After

Then we moved on to attaching those upstairs railing balusters that we had left unattached for so long. That was a little tedious and took us right up until lunch time. We took a short lunch break and then moved on to the basement!

If you remember our "Lean Mean Cleaning Machine" post - back on 4th of July weekend when the summer started (OMG has it been an entire summer?!) we cleaned out the garage and put all the home improvement related tools in the basement - creating a huge mess down there.

But it was an organized mess, with piles for plumbing, carpentry, electric, etc. All we had to do was build some additional shelves and put everything away neatly. So, we used a bunch of scrap wood and made the most makeshift shelves you've ever seen. I told Mike they looked like sketchy bunk beds. But they were pretty sturdy. And here's how everything looked when we put it back:


See, previously we had only had that smaller shelf on the left and we added the long part on the right. And all the stuff fits beautifully! I couldn't have asked for more... except perhaps a couple more storage boxes. All in good time.

After that was done, we were able to vacuum and clean up everything else down there, making room for all the extra porch lumber, which had been sitting outside for over a month.

Ah, the lumber section.

And Mike brought up an interesting point. We probably have enough extra wood to frame out a basement bathroom. "We should make a bathroom down here before we even think about doing the upstairs bathroom," he pointed out. A valid point. With only one bathroom - tearing down your bathroom leaves you toilet and showerless. I had half a mind to start him building on it right away...

But there's a roof and siding to consider. So this one may just be as well off left to the list of winter projects. Fall's agenda is just too long to list!

Lastly, as night fell on Labor Day, we installed the railing to the basement stairs... or at least half of it. (It's a split railing, and we don't have the bottom newel yet to attach the bottom part to.)

All in all - a very productive, non-relaxing labor day. And I wouldn't have wanted it any other way.