header-photo

Wait... What?!

I think I've reached the pregnancy state of total brain capacity overload. Mikey's Birthday party has come and gone... my good friend's Bachelorette Weekend has come and gone... Everything should be hunky dorey, under control.

Yeah, no.

I feel more flustered the ever. More in a rush to complete things that I can't complete. More frustrated by the lack of interest over at Craigslist. (Buy my stuff, people!) And generally more exhausted by the every day. Very unusual for me.

We're having the big yard sale this Sunday - selling a bunch of furniture from the upstairs office and basement, miscellaneous items, chainsaws, an outboard motor, some electronics including a DVD player, video camera, and keyboard... Should be highly exciting, but not a big money maker. Mike is wondering why I'm putting forth such effort for so little return. "Why don't you just take everything to the dump?" he asks. Sorry my stuff isn't worth very much, but it is worth something... I hope. Least I can do is try. If that doesn't work - free on the lawn. If that doesn't work - dump.

Down in the basement, we're stuck. On mother's day we measured and cut as much of the baseboard trim as we could without installing the doors. (Which apparently is going to be an issue because there needs to be drywall on the other, unfinished side of the wall before those can be hung?! WTF) So all the trim is cut... two coats of stain applied... but it needs a third coat. And we're out of spongy brushes. The trim is on hold for spongy brushes. The doors are on hold for drywall. The rest of the trim is on hold for doors. The plumbing is on hold for trim.

I'm so ready to just take a knife and stick it in my brain, repeatedly. The whole situation is so stressful, I think I've just been blocking it from my mind completely.

Meanwhile, Mike in his infinite wisdom has taken steps to start an entirely new project. Great. Something else to take time away from the entirely unfinished old projects. It's another opportunity, much like the kitchen, that cannot be ignored, so I understand. But timing is incredibly bad. The short of it, there's a dude, with a truck, that needs some major work. In trade for a truck-fix, he has offered to build us a new chimney. Whether this is just for the furnace or for a wood stove, I have no clue.

Mike said we couldn't do two flu - floo? No clue how to spell it, but it can't be done. There's not enough room. So what is this for?! I have no idea. I really hope we're not going through all this effort for just a furnace venting chimney.

On Monday he went to the town and applied for the permit. They called him back on it asking for plans, which he's having the dude draw up for him. This thing is for really real. And then he dropped the bomb on me last night that he was going to have to dig for the chimney foundation.... alllllllllll the way to the floor of the house foundation.

And I'm thinking to myself, are you freaking kidding me? We just managed to get some grass growing over there and now you're going to bring in the skid steere and dig a big-ass hole and ruin everything. I expressed my concerns to him in much nicer terms... I know this is another one of those "opportunity jobs." I just got a kitchen for god's sake, I shouldn't be complaining.

It's just a lot of major stress. At least I can take comfort in the fact that our grass is growing nicely. We fertilized twice with nice results - using human poop. Cheap and effective, though slightly smelly. And not our own if that's what you're thinking - from a package. You weirdos. All the trees are doing well - even that Japanese maple I bought and thought I killed last year. It's back with a leafy vengeance this year.

I bought all the porch plants from BJ's again - though I'm not satisfied with this year's like I was with last year's. Had to buy for Mikey's party though. Spruce up the porch.

The coming weeks will be interesting to say the least.

Killer Week

My back is just killing me this afternoon. Just thought I'd share that with you folks. I need to make an effort to relax, stop doing stuff, and go to bed earlier. At least for a few days. It was a rough weekend.

The driveway stuff delivery did not come on Saturday as scheduled. They told Mike over the phone that there would be up to 5" pieces of cement in the reclaimed mix - too big for our taste. He cancelled it all and decided to go and look at our options before making a decision. When he came home Saturday night, he had been to the materials yard and decided that crushed blue stone would be a better way to go.

Lucky for us, they deliver on Sunday and the price wasn't that much more. $170 vs $120 for the concrete stuff. Done and delivered before noon on Sunday. What service!



Sunday afternoon, Mike was out of the house and I took it upon myself to paint the white on the porch steps.

Just tilt your head - this one won't turn in iPhoto for me. Grrrr!

 I may have failed to mention that I also wet wiped/dry wiped the basement tile grout on Saturday. Feeling motivated after finishing that job, I cleaned up the drywall mess in the tub and moved in the vanity and the bottom half of the toilet. (I should not have been lifting either.) Then, I put in the recessed light bulbs and trim on all but one recessed light. (Turns out the shower needs an R20 rather then an R16 bulb.)

I also brought more summer stuff on the porch - the cushion for the chaise and all the small plant holder tables. I checked BJ's, since that's where I got all my awesome porch plants at this time last year. But this year, they don't have anything similar. Just small ones. What a disappointment. Now I'll have to go on the hunt for similar ones at a similar price...

Anyway!

Monday, Mike gave the stairs a second coat and spread the stone. Turns out we just barely got not enough. There's a little portion across from the garage addition that will have to go without stone for a bit. Tuesday, Mike brought home a compactor from work and hit the entire stone driveway.

Meanwhile, I've been busy with preparations for Mikey's bday party saturday. Neither of us have been back in the basement, which is regrettable, but unavoidable at the moment.

Today I'm just exhausted and in total pain. I need to take it easy. It's not even Friday yet.


PS - Garage Trim. Very late in posting this pic!

What's That Stuff Now?

It's Wednesday and we haven't been down in the bathroom for a wet/dry wiping of grout yet. It's all my fault this time - I've got us side-tracked for the time being on a time-sensitive bday project. No worries though, it'll hopefully be completed tonight!

Speaking of side-tracked... we're getting a delivery of material for the side driveway on Saturday! As you may not recall, we regraded the entire back yard and side driveway last spring, after terrible winter flooding in the garage. Needless to say, the pea stone that was previously in the side driveway is no more. We could not really salvage it for that use and instead, put it half-way down our backyard hillside for traction control. (It was never intended for driveway stone anyway - it was leftover from the pea stone we put in the basement in prep for the concrete floor way back in the day.)

Long story long, we've got dirt there now. And if you dig in dirt in our yard, you find broken glass, shards of metal, and other debris from trash burying days gone by. Not good for children. Plus, we park a boat and other vehicles in the side driveway. Dirt, specifically sandy sandy dirt, is not good for that either. I wanted some other sort of stone... larger then pea stone... but Mike wanted something that would compact. I caved to him this time, and agreed.

He first wanted a product made of recycled asphalt. But, as it turns out, this is not as readily available as he thought, as they're now using recycled asphalt in road applications. What is available is a product made of recycled concrete. Interesting. Supposedly compacts similarly. And it's cheap cheap cheap. The entire driveway's worth is only $120. (Now I'm feeling like I should have done it last year. Who knew?) So that's a no-brainer.

Do I have any clue what this stuff is going to look and feel like? Nope. Nervous? Sure I am. Once this material is down and compacted, it can be overlaid with stone or even paved, so nothing is set in stone. (So to speak.) I guess I'll find out on Saturday. The delivery will arrive sometime before noon and Mike will spread it with his machine when he gets home from work.

And as for the bathroom - we'll likely start back on that Thursday night and into Sunday, depending on what's going on. The old bathroom is leaking out of control - don't think we've forgotten.

Early Grout and Sunday Miscellaneous


Feast your eyes on the glory that is finished tile! Duh duh duhhhhhhh! Friday night, Mike and I sat down at the computer and picked out the grout color - Mist 939, a medium grey. My dad picked it up Saturday morning and arrived early Saturday afternoon to begin work. By late Saturday afternoon, the job was done - and beautiful.

Dr's orders, stay off the tile for a couple of days, then hit the grout with a wet - dry cloth. Good to go. Couple days = Tuesday. And I told Mike Saturday night, this battle station must be operational ASAP. Just Five Easy Steps! 1. Baseboard Trim. 2. Vanity and Toilet. 3. Plumb from pump to septic pipe 4. Lighting and fan fixtures. 5. Doors. I don't think we've ever had so much "in stock" and ready to go like we do in this room. Quite a satisfying feeling, knowing we're not going to be running out to the deepHo for anything major.

So with the bano tiled a day early, we had Sunday to tackle some other tasks and even managed to have friends over! (ooooooo!) The previous Thursday or Friday, I finally had an opportunity to purchase winter moth repelling tree spray, and Mike applied it to all our new trees Sunday morning... those bugs love the cherry blossoms and the two trees in the front yard have suffered hard for the past couple years. Next on the agenda, Mike trimmed the garage door and installed the weatherstripping. (Only been a year that this job has been sitting idle.) The garage finally looks finished now! Then, he cleaned up wood and logs from the tree we felled after Hurricane Irene and chopped up another tree that we'd lost in the backyard over the winter.

After a little bit of building material cleanup on the porch picnic table and cleaning of the kids' water table, we still had plenty of time for friends. (Awe, muffin.)

Headway Slows, List Grows

Time to dust off the 'ol keyboard. Yuck. I hate going this long between postings. When I finally return, such as now, I have a hard time remembering where we're at, what's happened, and why I should bother writing about any of it.

Starting in present time, we just returned from a family trip to Baltimore. Nice trip, successful. (Because when you're a parent, you give yourself a grade on your trip as if it was an exam. Mine are improving each time we travel.) While we were gone, my dad came to our house and tiled the basement bathroom! We obtained a tile saw for him to use and set it up in the garage, brought all the tiles downstairs, and cleaned up enough for him to be able to work. When we got home, the tile was laid and two marble thresholds had been installed in the two doorways.

Beautiful. The only thing missing now is grout, which I hadn't picked out yet at the time. Hopefully we can find some time this weekend to finish the job - Sunday, most likely. Once the grout is done, we can install the baseboard trim, which we should have enough of in-stock.

Come to think of it, we could even start cutting and staining that beforehand.... Hmmm...

After that, installation of fixtures (lighting and plumbing) and all doors. It's so close, I can just imagine myself in that new bathtub now.

Before we left for our trip, we managed to stain our side-porch steps. (They were too new to stain with the rest of the porch last year.) We hope to get another coat of stain on the entire porch in the coming weekends... Sunday, perhaps? (I sense a list coming.) Also, we seeded the side yard where we replaced the old trash hut around Christmas time. Grass is beginning to come in, but boy could we use some more rain to help it along.

On the list of Spring To-Do's, there's quite a bit more to be done. (Bathroom is behind schedule, as usual. But we can't complain, as we didn't schedule for a new kitchen in the middle of it all!)

To Do This Spring

Fertilize Entire Yard - ASAP
Install canopy on Mikey's playground set
Replace and change angle of slide on Mikey's playground set
Some material for side-driveway (now dirt)
Rubber roof the kitchen (has been tarped for over a month now)
Gut the old bathroom (upon completion of new one)

My List

Yard Sale (get rid of crap and old furniture)
Get new rug and re-arrange office to be shared with new baby
Create backyard seating with cinder blocks (Pinterest inspired project)
New plants for farmer's porch
More house plants
Basement cleaning (upon completion of bathroom)

So, I'm thinking that all can be accomplished in the next few weeks.... or not. A lot depends on money at this point. We're down quite a bit from dental work, new tires, and the Baltimore trip on top of our usual expenses. Mike is doing what he can. And my yard sale should generate something. (Thinking Memorial Day Weekend on that one.)

Stay tuned!
 

The QEP FAQ

It’s a no-go on the under tile heating. We measured our heatable space and went online to Home Depot. (Being of little cash and without desire to pay credit card interest, the HD and their 0% financing for large purchases was the only option we could consider.) The chain carries one brand of under tile heat, available online only. How convenient.


The product description matched exactly what we wanted – quick and easy to install – ease of operation – quality heat. Mike wanted to know if we could cut it, so we went to the manufacturer’s website, www.qepfloorwarm.com to see if we could find out. We watched their installation video http://www.qepfloorwarm.com/Installation/Installation-Videos.aspx and read the FAQ. Everything looked great… but according to the FAQ, you can’t cut the stuff.

Now came the price tallying. We would need two 2x9’ rolls… at $215 a pop, plus $40 of floor primer, plus thermostat (not included), plus wiring up to thermostat (not included), plus junction box (not included)…. We were over $500 before we even hit thermostat.

Nope.

Just can’t justify over $500 for under floor heat in a basement bathroom. Sure would be nice… the product looks great… but it’s too much right now. The unfortunate thing is, we can’t shop around because we just can’t afford it in cash at the moment. Not with Mike having a root canal, me with a set of new tires, and a family trip to Balimore in under two weeks.

Good news? This means we can just tile away! I left a message for my dad today (retired floor man) and hope to have him scheduled to help with installation soon. All we need to purchase is grout. (I’m hoping dadoo can help me with color selection and amount for our space too.)

After that, a little baseboard trim and all the fixtures can go in!

Not Pickin Up the Call of Spring

Time marches on…. or maybe I should say, “April’s on.” Yes, hello, spring called a while ago and I seem to have forgotten to answer the phone.

Pretty much as soon as we had our kitchen organized and life back together, the boys were back to work on the bathroom downstairs. Our neighbor and Mike finished the drywall and paint in just a couple days. (Missed the “you need to blog about that” message too. This was ages ago… you know, like beginning of last week ago. Practically the stone age.)






And once that was done, we hit a brick wall. We have all the tile. Installing it is the next step. The problem? Mike’s thinking we should do under-tile electric heating. Apparantly, it’s super easy and inexpensive. The problem? We need to measure the square footage needed… no need to heat the entire floor, right? Just the traffic areas. The problem? Stoopid stuff. Laziness. Bruins games. Workin’ late. Excuses excuses.

I think we’re still in a state of epic come down from the whole kitchen re-do/bathroom drywall madness. Mike’s barely recovered from the workload and feels he needs an extended break. And I can only push so far too… after all, I’m tired too.

How To New Kitchen In Less Then 3 Weeks. The End.

I have been completely and utterly out of control for the last week. Yes, for some reason, I suppose I had gotten used to chaos…. so when the chaos suddenly ended, I was lost and confused, running around not knowing whether to scratch my watch or wind my butt.

The kitchen was completed last Friday – but basically done on Thursday minus the cabinet hardware. I remember walking in the house after work Thursday night… it was literally one of those HGTV “Big Reveal” moments. I had seen the layout. I had seen all the cabinets going in. I had seen the MDF countertop form. But to see the real countertop on those cabinets… and all the doors and drawers on… the sink in…and all the appliances in place. It was amazing. Drop dead gorgeous, I can’t believe this is my house, this is a rich person’s kitchen amazing. After our installer left, Mike and I just stood there like idiots, marveling over it. We were both blown away.



 The light colored countertop brightened the entire room and complimented everything – the cabinets, the floor, the appliances, the sink… And I just knew all my red accent pieces (toaster, knives, Keurig, etc.) were going to really pop against it. Not only that, the entire countertop was seamless – even in the corners! And the backsplash went up on the wall much higher then our old one. The countertop also butt right up to the stove, so no more dropping massive quantities of foodstuffs down there with no means to clean it up. It was awesome.

The sink fit so much more easily in our  new cabinets too – no more too-big stuffed-in-there look with no room to clean behind it. Now we have countertop behind and in front of the sink for easy cleaning. Plus, the sink light, which was always off-center above the sink is now truly centered! (You have to remember, we made yard sale cabinets fit the space, so we’re lucky the light made it in even the right vicinity the first time.)

The weird corner by the fridge where the old window used to be is finally looking like “part of the kitchen” instead of “a weird corner where a window used to be.” The upper cabinets on that side work perfectly, despite my hesitation at getting them. And the extra counter space on that side makes the whole kitchen look bigger, as it creates a better flow. (A U shaped, circular flow, if you will.) The large fridge finally looks like it was meant to be there, instead of a huge-ass fridge somebody stuck in a super small space.

Our stove, if you recall, we moved over about the space of one cabinet, at the suggestion of our designer. This too, I was unsure about, since I didn’t want to lose any cabinet space. But I’m so glad I followed his advice. Again, this one small change, a little tiny move to the left, makes a huge difference in the overall flow of the room. Before, the stove was too close to the fridge and, again, boxed in that weird old window corner. Now, the two appliances have room to breathe, and there’s still a ton of cabinet space, especially with the new above-microwave unit.

We are 100% satisfied. Expectations exceeded by leaps and bounds. Mike told the dude straight up, “You’re the only contractor we’ve ever had in here who did a great job.” And it’s true. In fact, he went above and beyond, taking his time with every detail of the installation. Everything is perfect. Perfect! There isn’t a thing out of place, and no compromises and no excuses (“Well,  X and Y aren’t working so we have to do Z instead.”) and no extra monies or materials or anything needed… And no mess to clean up afterwards. Our experience was unbelievably good.

After we got over being completely dumbfounded in our new kitchen, Mike and I re-installed the track light, re-moulding it to fit the new space so that lights shined now in both corners as well as across the front. (We ended up only using four lights out of 5, which is perfect since I broke #5 while cleaning back around Halloween.) We also put back up some of our wall décor. Mike, seemingly inspired by the meticulousness of the kitchen installation, took the time to measure and properly center everything too.

Last Friday, the hardware and bottom trim installation was complete, thus completing our kitchen renovation. You’d think after our installer said, “It’s all yours!” I would have gone gung-ho, replacing and reorganizing all the foods and dishes in the cabinets right away. Nope. As soon as those words were uttered and the door was shut and the van was driving away… My brain turned to mush.


 I began putting a few things here and there, but felt mostly like an overwhelmed zombie. Saturday wasn’t much better. Again, I continued to put away more stuff,  but felt scattered. Thankfully, I had somewhere to be in the afternoon. I needed a mental break from lack of chaotic activity. Sunday, Mike spent most of the day installing and re-plumbing the sink and dishwasher. We ran into a few hurdles, some leaks, some bad hose, a minor flood… the normal stuff. By the end of the day – and I mean truly the end because we had a hose go bad when I finally tried to run the dishwasher around 6pm – everything was back to normal and functioning well.

But the return of the sink F’d me up for an additional day or two. Knowing the day was soon at hand, I’d let dishes just sit for a while. So there were a lot of them. And we had run out of paper plates. So there were plates too now. If I can manage to put away dishes from the dishwasher tonight, I may be finally caught up after 4 days.

And at this point, everything is finally put away and organized after all the picking away at it. I think I did a decent job of figuring out the  most efficient arrangement. (Took me long enough though.) The plates/bowls are over the dishwasher for easy putting away. Pots, pans, bowls, and frequently used small appliances are in the lower corner next to the stove. Infrequently used items like good china and fondue pots are in the upper corner next to the fridge. Food items are mostly in the lazy susan next to the fridge with additional small and canned items in some of the upper cabinets around the stove.

The cutlery is below the cutting board work space. The trash cabinet is right next to the cutting board work space for easy cleanup during food prep. The trash bags, plastic wrap, etc are all in the cabinet next to the trash cabinet. The old trash can is out. (Let me say, it took us a few days just to transition to a new trash can… that’s how messed up I was.)

The cups and mugs are back where they were originally… and believe it or not, we have unused cabinet space. AND – all that bulky BJ’s food and potato/onion containers that previously had to be stored on top of the fridge because they didn’t fit anywhere else?! They all fit in this kitchen. No lie. The lazy susan is big enough to handle large and bulky items with ease. My only gripe is that items in the lazy susan must be arranged so as not to bump the hinge mechanism of the door. That’s a little bit annoying, but in no way am I dissatisfied.

The only other small inconvenience – my ice cream machine does not fit under the cabinets anymore. But that’s ok… because it fits in the cabinet with all the pots, pans, and other frequently used items.

We now have trim at the base of the cabinets, whereas before we had none and the grout from the tile was splattered messily on the bottom of the old cabinets. The hardware looks great and coordinates well. I just can’t say enough good things about this kitchen.

And here on Wednesday, I think we’re finally close to enjoying it. We have to clean the floor of all drywall mess… do those last remaining dishes… and reinstall the bag holder and pot lid holder.

How To New Kitchen In Less Then 3 Weeks. The End.

And Then There Were Uppers...

More kitchen installation progress on Monday! The countertop form was finalized, with plenty of measuring, cutting, and sanding, and more measuring. Then, in the evening, we got our first glimpse at some of the uppers - the corner unit and adjacent cabinets, including the microwave unit.



And look at how well the color matches the window trim color. Incredible. I would have never thought it would be so close!

No more countertops for a while... the forms were taken back to the shop for lamination or whatever you call it with the actually top pattern design part thingie.

Life Minus a Few Boxes

Lack of blog postings, yes. But believe it or not, last week turned into a fabulous mix of relaxation and productivity. (First time for everything, right?) Early in the week I was still feeling “off” from that nasty stomach flu of the previous weekend. But that couldn’t keep me from my previously scheduled Spa Day on Tuesday! (So needed, so relaxing.)

Tuesday night, Mike and I decided to open and check the contents of every single kitchen box. (Since every single box was stamped in large letters “OPEN AND CHECK CONTENTS WITHIN SEVEN DAYS,” and the 7th day would be Thursday.) Luckily, everything looked great. No frantic calls to the company needed. We also discovered that we’re going to have one of those secret sponge holding compartments in our sink unit – I had no idea, so cool! And the lazy susan cabinet looked incredibly huge – a much more effective use of the corner space then our old unit.

Originally, the neighbors were scheduled to come over Wednesday and Thursday for more drywall. Originally, our cabinet installation was supposed to start on Thursday afternoon. None of this ended up happening. Turned out that this was just fine. Mike got some needed nights off and I finally started feeling digestively normal again.

Friday was my birthday! Mike got me what I really wanted – a composter! I had told him not to bother with it, that it was too expensive of a gift with all the renovations going on. Then, he happened to come across a free one, a brand new free one. I was excited beyond belief. He also got me the little kitchen compost can thing that you put your food scraps in. (That’s on order.) Just a few more weeks and it’ll probably be warm enough for me to start it up!

Friday afternoon and into the evening, kitchen installation began. It was weird to just let a guy into my house, show him where everything was, say “have at it,” and then leave. Mike and I discussed it as we ate out for my birthday dinner. Plenty of people do it all the time… hire people to do something and then just let them do it by themselves. It’s perfectly normal, so I suppose that makes us incredibly weird. We either do it ourselves or help the person who’s doing the work… the person doing the work is usually a friend or friend of a friend.

*Luckily, it turns out that we don’t have to move those two pipes. They can be worked around.

When we returned home from dinner, the base cabinets were all in place. They weren’t all fastened, but they were out of the boxes and in the kitchen! (And thusly, we reclaimed the mudroom and a portion of the living room!)



Here's the final paint job - I didn't get a chance to take a pic before

Saturday was a second installation day and a shoot day… and as the afternoon wore on, I began to understand why they told me the installation would take two weeks. Every single cabinet is meticulously leveled and straightened and matched to the others… And especially in an old home like ours, where nothing is level, plumb, or straight, this is a JOB. The shoot crew was in for a while, and once they left, I felt exhausted and napped into the evening. (Again, a little weird to go upstairs and nap while someone was downstairs installing my kitchen.)

By the evening, all the bases were actually fastened and the dishwasher was in place. (Though not hooked up yet.) The beginnings of a countertop was also cut and in place. Remember, we are getting another formica/laminate/whatever-you-call-it countertop. But this one will be a custom job! So in this first step, the “insides” of the counter top, you know, the MDF or whatever the stuff is, is cut to the proper dimensions and shape. That’s what we have sitting atop the base units right now.





Sunday, Mike took a much needed day off with his friends while I had another nice birthday dinner with Mikey at my parents’ house.

So you see what I mean by relaxing and productive. People who are stressed out by renovations when they’re done by other people need to just shut up. They don’t know how good they have it!

The Continuation...

Friday night, the stomach bug hit me and I suffered, hard, for the next 10 or so hours. Saturday morning, I awoke in absolute agony and exhaustion. Cats meowing. Kid crying. I could barely do anything without sitting down to rest for a few minutes in between each small action. Despite my mom, who came over to let me rest for a while, it was a difficult and trying day. Mike was late coming home, buying a guitar. I was spent.

Sunday morning I felt much better, rested, and hungry. Good sign. I ate a normal breakfast. Suddenly, it was back to business as usual. Our neighbor was over around 10am and he and Mike completed the painting in the kitchen. Then, Mike was on his own. He put the window trim back on. He nailed down some plywood to match the thickness of the tile where there had previously not been tile. He was mauled by a falling cactus. (Don’t try and catch your cactus.) And Sunday ended.

The only small bit of work that remains in the kitchen is the relocation of two pipes – heat for the upstairs. It should not be a problem. Tomorrow, I’ve got to get on the phone with the kitchen guy and the production people to try and coordinate this installation. Apparently, it’s going to take longer then I imagined. I was thinking just a full day of work to get these things up and set… But maybe I’m the crazy one for thinking such a thing.

It’s been a full official week now and one of the worst I’ve had in a while. Here’s to good times ahead – I know they’re just on the horizon. Just have to get there.

Hanging In There

This will go down on record as possibly the craziest and most uncomfortable week ever. Lack of kitchen, yeah, I can deal with that. Been there, done that, know the drill. But not with all this!

Monday: Mike finished hanging all the drywall. Two or our neighbors came over and did some taping that night.




Tuesday: I had my ultrasound and found out, It's a Girl! (The pre-anticipation and post-mental overload have left me in a state of numbness all week.) Tuesday night, the neighbors were back for more taping and mudding.




Wednesday: Was a day of rest for the guys, but I still had to do a bunch of driving in terrible weather, which is always stressful.

Thursday: Cabinet arrival day! I rushed home around 12:30 to meet the delivery dudes... who delivered an incredible amount of boxes, filling the entire mudroom and living room. (As if they weren't already stuffed enough.) I opened one of the boxes after the left... the cabinets are even more beautiful then I had envisioned. And then I rushed back to work only to just barely sit down at my desk when - RING RING! Mikey's school. He was sick with the stomach flu. I had to get back in the car and go all the way back past home to pick him up and then back home... and try to take care of him in a living room full of boxes!




I was exhausted by 6pm, which was the exact time the neighbors knocked on the door. They did the pea coat and sanding with Mike Thursday night. Once that dried, it would be ready for primer and paint.




Mike cleaned up after they left and we both collapsed into bed around 10.... at which time, Mikey threw up again... in bed.... soaking everything. He had to sleep with us. (And we do not sleep well with him - he kicks and punches and rolls around like a mad man.)

He did not throw up again, but Mike and I were still exhausted when we woke up Friday morning.

Friday: Mike stayed home with Mikey, as he could not go back to school within 48hrs of the bug. Our neighbor had the day off too and the two of them primed... and then painted the kitchen. I was in disbelief when I got the pictures via text. I didn't think we'd have enough wall paint... and I was pretty sure the small remainder of the ceiling paint was unusable.

Meanwhile, I tried to coordinate cabinet installation for this upcoming Monday, (what with the amazing progress) but the production crew was unavailable. We'll have to shoot for (haha) Monday the 12th. Hopefully at least we'll be able to move the boxes into the kitchen until then. The stove and the dishwasher are both hooked up. The biggest pain now is all the boxes.

Jumping in the Kitchen Headfirst

As name implies – there’s no going back. We’re kitchen committed now. Mike… my poor guy. He’s going to need a serious break after all this.

Let’s roll the clock back to Saturday AM. My monumental task of the day is a mission of epic proportions. The entire kitchen needs to be emptied. The contents of the entire kitchen cannot be in the kitchen. Dangerous, sharp, and spillable/breakable items cannot be within the reach of our 2.9 year old. The entire house needs to be meticulously cleaned. The entire kitchen needs to be meticulously cleaned. Why? Well, here’s a portion of the big kitchen secret. It’s all being filmed.

I can’t divulge more then that at this time, but, very HGTV-like, we needed to prepare a proper “before” shot. Clean, clutter free, but still appearing as though someone really truly uses this kitchen. (Can’t clean the counters completely, can’t remove pictures from the wall or plants from the window sill.)

It took the entire day. Literally, the entire day, to do this. First, I cleaned areas not the kitchen. Bathroom, mudroom, living room. Did the dishes. Did the laundry. Made a quiche. Started marinating a pulled pork to put in the crock pot Sunday AM. (Preparing for a difficult-to-cook situation. Can you tell I’m an old pro at this??!)

Once that was accomplished, it was on to the kitchen. I started with the clutter. The stuff on the fridge, off. The pens/pencils, vitamins, and other junk on the counter, off. Then, time for the cabinets. I took a deep breath and went through them one by one, stuffing stuff wherever stuff could be stuffed. I threw out some things. I brought some other things to the basement for storage. Discovered I had at least 10 Coors Light cooler bags. (No new cooler bags this summer!) And slowly, all the cabinets were emptied.

There’s stuff on the piano. There’s stuff under the piano.There’s stuff on the wall of the mudroom where I removed Mikey’s easel and our shoes. The glasses and tupperware are in the laundry basket, in the laundry closet.


There’s stuff on top of the kegerator. 


There’s stuff on the living room shelf thing – and on top of it.


There’s stuff on top of the entertainment center. Plates and bowls are in one end table. Pans are under the couch.  



There’s stuff in and on the bar.
 


There’s fondue pots in the hallway. I felt like some sort of super-organized hoarder. Stuff, stuff, and more stuff everywhere. And yet the house was still clean.






I discovered the original yard sale price tag from when we purchased our current cabinets. $200 for the whole set w/sink. We didn’t take the sink. Either that or we took it and threw it out.

Without much time to reminisce, I continued on. Once the kitchen had been emptied, it had to be cleaned. I was exhausted, but cleaned and tidied what I could before calling it a night… because that’s what it was at that point. Night.

Sunday morning, we were all up early. After breakfast, Mike got out the buffer (yes, an automotive buffer) and cleaned the stove and all our stainless steel. (Refrigerator, stove, and dishwasher.) And if you think cleaning your stove with a buffer is crazy… well, you should see what an awesome job it does. Just put a little glass cooktop cleaner on there and have at it. (Make sure you’ve wiped the surface free of all crumbs, etc first – else you could scratch your cooktop.) Meanwhile, I tidied up more, cleaned more, vacuumed, and swiffered. 

In a groundbreaking first-time-ever event, we were finished before the film crew arrived. (Usually never finished on start time – whether it’s a party or any event.) Then, for the next hour or so we did all our “befores” and even took down a few cabinets for show. It all went surprisingly smoothly and the crew was out and on their way on time, leaving us to do the rest on our own.

Everything went very well at first. The tops all came down no probs. There was a little mildew on the upper wall by the stove. Ok. No sign for alarm yet. The bottom on one side of the stove, no probs. Sink – pain in the butt, but not really a problem. After everything was disconnected, it wouldn’t come out. We had to use a sazall to cut the countertop around it off. Dishwasher unhooked with no problem. Shelf demo was fun and exciting.




Then we got to the rest of the cabinets on the back wall, on the left side of the stove. Problem. The cabinet right next to the stove pretty much fell apart as it was taken out. As in, all the sides collapsed. Why? Water damage. Behind the damaged cabinet, more bad news. Moist and spongy drywall. (Three words you never want to hear together in the same sentence.) Behind the moist and spongy drywall, yucky insulation. More bad news. Prognosis: the ceiling is leaking down the wall. How do we know? We can see the trail of cracked paint on the ceiling and now moist & spongy drywall, yucky insulation, and a damaged cabinet on the wall. Treatment: immediate removal of grossness and immediate emergency roofing.

Cracks in ceiling paint - mildew on upper part of wall

Potion of no drywall = bad. See that blackness on the insulation?


First, of course, we finished removing the cabinets and countertop and hauled them all away. Then, we ripped out the entire kitchen back wall. Drywall and insulation. Mike examined the sill and the studs for water damage and luckily, everything looked good. He spent the rest of the afternoon on wiring, since the new layout moves the stove over and incorporates a microwave on top. (A couple outlets needed to be moved… and we had an extra wire in there already, having planned for possible future stove-vent wiring. Smart, huh?) I spent the rest of my afternoon doing what else – cleaning up.

Hope future generations appreciate my insanity




So, changes in the wiring + no outlets in stock = no stove. Smart again with the dinner in the crock pot! The refridge is of course on its own breaker, no problems there. We did however have insulation in stock, extra from the basement bathroom. Most of that went up Sunday night before we called it quits.

We also put a call into our roofer/builder, Timmy. He did our entire other roof – everything but the kitchen, which we held off on at that time. He also did much of the finish work on our farmer’s porch. And let me say, he’s a great resource for questions or advice in either of those fields. Bruins fan – great guy. Another asset to the neighborhood. Anyhoo, Mike briefed him on the situation and they agreed that a rubber roof was the only way to go on a poorly sloped roof like our kitchen’s. Problem – you can’t rubber roof in temps under 50 degrees. But, and this is good prep for a new rubber roof anyway, he advised us to ice & water the entire thing. That should hold us off until spring.

Now, it’s the end of Sunday night. There’s stuff everywhere. There’s tools and building materials everywhere. The stove is off. The drywall is down and insulation is up. The truck is full of demo. In prep for the new kitchen, we had not planned on replacing any drywall. We had only planned for fixing cracks along the adjacent wall and re-painting. (No paint behind old cabinets.) We had certainly not planned on a new roof! The wiring, we knew about, and that was relatively easy. There are two pipes for the upstairs heat that need to be re-routed that we had forgotten about. Kitchen sink plumbing can come after the fact, thank god.

And the new cabinets are coming – this Thursday! Gulp. Everything must be completed by this weekend.

I Like to Tape It, Tape It, Mud It, Mud It

As promised, all the taping was completed on Tuesday night. I could hardly believe it. The guys worked from 6:30pm – 8:30pm and finished all the taping.



Wednesday, Mike picked up some corner beads and masking tape on his way home. Then, from about 6:30pm – 8:00pm, he and our neighbor finished installing and mudding all the corners. And, they did all the mudding and whatnot around the tub/shower. (That’s what the masking tape was for.)

I could hardly believe it. It’s looking awesome. Incredibly awesome. Incredibly fast. (This is what happens when you work with a professional.)

The two of them will be back at it tonight and probably Friday night. And that’s it. Paint-ready.

Full Speed Ahead

On most of these holiday Mondays, I feel like I’m the only one working. Yup, no three day weekend this Presidents Day. But while I was sitting at my desk, Mike continued to make progress at home, hanging more drywall. He even did some mudding in the closet.

He asked me to pickup some drywall tape on the way home, which I did. And when I arrived, I was surprised to find our neighbor pulling in almost right behind me. The two of them did some taping in the closet and then Mike continued on by himself for the rest of the evening.

I joined him after Mikey’s bedtime and we finished hanging the drywall. 100% complete.




Our neighbor will be over again tonight after work… He thinks he can have the entire room taped within an evening. A couple more days of mudding and sanding after that and we could be painting by this weekend. This, I did not expect. And I doubt we’ll have time to be painting this weekend, but you never know. Saturday night is a possibility…