header-photo
Showing posts with label re-siding. Show all posts
Showing posts with label re-siding. Show all posts

Manic Monday

The insane plan that I outlined yesterday worked only partially. (What do you expect? It was insane.) Kudos to the guys for putting forth a great effort and accomplishing all that they did!


Here's the wide shot - as you can see, that living room window is back in place and shingles are up all the way past the top of that window.

The very tippidy top near the roof has yet to be completed. 


The other side is where things get interesting. As you can see, the entire thing has been stripped. What you can't see? We avoided a HUGE step in the process... The plywood! We assumed that like the rest of the house, this side's original barn board exterior (that had been covered first by shingles and then blue cement board siding over that) would be in such poor condition that it would need to be re-covered with plywood. Like the house's back side, adding plywood would mean removing the two windows you see pictured and re-installing them post-plywood. Pain-in-the-butt.

Removing and re-installing those two windows would also have screwed up the interior window trim, which would have to be thrown out and re-done as well to accommodate a new plus-plywood depth.


Luckily, this is the one and only side that the barn board was in good enough condition not to require plywood. The guys stripped it down and stapled up the Tyvek.

Also what you can't see, the octagonal window hole has been cut on the outside side. The guys had to move a stud and make several pain-in-the-butt changes to get it to fit where we wanted it to fit. Inside, the drywall is the only thing left that needs to be cut before the window can be actually installed.

Before Shot - Window to go above that table
 

Window Ready to Go
Mike is at work today, but his guys are back at our house to work on that tippidy top portion. Mike picked up some more shingles at the DeepHo last night... gulp. I know this little spending spree is almost over - and we'll be able to return a heck of a lot of plywood that was meant for that other side. I'm looking forward to having it done and taking a much-deserved break to catch up financially, mentally, physically.... I know Mike is too.

Wow, Other Wall

The crazy pace continues relentlessly. Sunday, Mike tackled the other side of the outside basement door. Starting early in the AM, he had plywood up and half the shingles before lunch time. We went to the Home Depot and picked up more trim boards, white paint, and flowers for our moms.

After lunch time, his parents came by and he and his dad completed shingling on that portion, set up the scaffolding, ripped off all the old stuff off the next portion, took out a living room window, plywooded, and put up the Tyvek. Oh, and did I mention our carpenter came by and finished up some flashing on the left side, up at the top? Yes, it was that kind of a day.

Shingling is done here


Adios Window - Hello Plywood
Much like the upstairs window right above the living room, this particular window was crooked. Not because we installed it incorrectly, but because we installed it in a crooked house. Then, we lifted the house to add a basement (this was years ago now). We leveled the house (as much as we could) when it came back down on the new foundation, but that made the once straight windows crooked! Especially on the back wall of the house.

As you may recall, the upstairs window on this side was leaking water into the bathroom... and kinda started us on this mad shingling spree. Though the living room window wasn't leaking, it was still crooked. And, as such, it was difficult to get out. It was just wedged hard in there! But it needed to come out so that new plywood could be installed behind it.

The plywood will be cut and the window re-installed. But by the time the guys had reached this point, it was the end of the day.

TyVek Up - No More Window
 So what could be more insane then a Sunday like that? (Happy Mother's Day to me, by the way. I got to go to BJ's... woo? hoo? It is what it is. Renovation life.) Anyhoo - more insane? Today. Today Mike wrangled a couple of his friends into a do-or-die re-do-all-the-rest day. Last night we talked logistics... shame that I can't be there today to oversee, since I helped him plan the most efficient course of action. On the goal list:
* Strip the tippidy top of the back side of the house, near the roof line
* Re-install the living room window
* Plywood and re-shingle the remainder of the house backside
*Strip the old siding off the entire other side of the house (pictured below)


*Install an octagonal window (that I've had in my basement now for four years, awaiting this moment)
*Remove those two windows you see pictured
*Plywood and Tyvek that side of the house
*Re-install those two windows
*Put up siding (that we've had under that blue tarp you see in the lower right hand corner of the photo)

Holy shamolies.

Why on earth do we think this can get accomplished? A. There's four guys. B. So much work got done on Sunday. C. That other yucky blue side, it's the shortest, smallest side of the house. D. The siding, as opposed to the shingles, goes up upber quick.

My brilliant logistical plan that I came up with to get it all done efficiently?! Here it is:

*When the first guy (G1) arrives, start him stripping the blue part where the new octagonal window will go. While this is happening, Mike and his dad continue shingling/put in living room window.
*As soon as the octagonal window portion is stripped, put up plywood in that section.
*While Mike is putting up plywood, send G1 to the tippidy top of the back to start stripping there.
*At noon, G2 arrives just in time to begin installing the octagonal window
*By the time the octagonal window is in, G1 should have finished stripping the tippidy top - send him back down to stripping the blue side.
*Once the octagonal window is in, send G2 to the tippidy top of the back to install plywood and shingles.
*While this is all happening, Mike and his dad continue to shingle the back.
*If back is finished, send Mike and his dad to help strip the blue side.
*Once blue side is fully stripped, Mike and his dad remove the two windows and begin plywooding.
*G2, once finished with the tippidy top of the back, go down to the blue side to help plywood, re-install  windows, or siding - depending on where the other guys are at in the process.
*Any back shingling that needs to be done can be accomplished by Mike, by himself, later in the week

This all might be a fruitless mission impossible. Typically in an old home, there's always something that goes awry and screws up even the best laid plans. Nothing to do but try your best and hope for some luck.

Hello March, Goodbye Leak?

Hey, we finally happened upon a weekend without a snow storm... Imagine that, right?! If you're in New England, you know exactly what I'm talking about. February = pure torture. And March hasn't been much better.

Obviously, I've been lacking here on the updates. The last two months, weather plus work plus illness plus events and activities, plus the hustle and bustle of every day life... It gets to ya after a while and your blog suffers the consequences.

I'm going to try and remember all that's transpired... bear with me.

When we last left, the house had been buried in Blizzard Nemo, halting all progress in the bathroom due to a leak in the roof. Subsequent weekends brought snow storm after snow storm... with a rain storm stuck in there too, preventing any work to be done on the exterior.... preventing drywall work to be done on the interior. Frustrating to say the least.

But while we were waiting for the weather, Mike was able to put together the shower enclosure. Sounds fun and easy, doesn't it? It was a nightmare of epic proportions.

First, Mike attached the left side wall. A little bit hard to wrangle.. but not a huge deal. He attached and caulked it in. The trouble came when he went to attach the right side wall. It wouldn't fit. It wouldn't fit by a margin of under an inch. There was a beam in the ceiling in the way. There was no way around it but to cut the beam... and the only way to cut the beam was to remove the left wall. The left wall that had already been screwed and caulked in.

So Mike removed the left wall and cleaned up best he could. Even after the beam was cut, the right wall fought hard. The walls and floor were neither level, straight, or plumb, so to get the two sides level and matched was near impossible. But after a lot of cussing and pushing and shoving and shimming, was able to get both walls in and caulked down


The following weekend, another winter storm meant time to install the glass. After his fiasco with the two walls, Mike was not looking forward to doing the glass. But, he started patiently, putting the glass enclosure walls together outside the bathroom first. No problemo.

Unfortunately, once he brought them into the bathroom - big problemo. Since the floors, walls, everything was so incredibly askew, neither of the glass enclosure walls would fit. There was a HUGE gap at the bottom that just couldn't be overcome. The shower base was just too crooked due to the floor. Mike and I sat down and discussed out options.

1. Was dismissed immediately - jacking up the bathroom floor from beneath to level it. This would cause severe and dire implications in the adjacent kitchen... the adjacent kitchen we just finished re-doing exactly a year ago. Walls would crack, cabinets might fall, the countertops might separate. No way. Not an option.

2. Remove everything - the shower walls and base - and attempt to level the base by pouring a foundation of concrete. But this would un-do all that work that had already been done. All that pain in the butt work. And there was no guarantee of success.

3. Shim the shower doors using Azek and caulking. (Yes, Azek. Why not? It would be completely water proof and we could cut it to shape. You couldn't do it with regular wood.) The difficulty here was the nature of the cut. It would be a difficult cut and when all was said and done, it might look stupid.

Be that as it may, option 3 had the least risk, and we went with it. Mike went to the HD, bought a couple of Azek boards in a light grey color, returned home, and began to cut. Several difficult hours later, and the glass enclosure was up, screwed in, and completely shimmed. It didn't look half bad either, almost as if the Azek was supposed to be there - like some sort of trim.





So far so good, although we'll see how things go when we actually begin using the shower.

Then, at long last, SUN on a Sunday. I remember the day well, it was Sunday March 3rd. I had already planned a day of hair coloring with my girl friend and her four kids, with her husband planning to hang with mine. But that morning, our carpenter and our neighbor (yes, they're related to each other, Uncle and Nephew) came over, inspired by the sun and ready to work.

Busy day? Understatement of the year. But somehow, it all worked out. The guys started by ripping down all the old siding and shingles beneath. Then, they took out the upstairs window.

Once Upon a Window
Once upon a time, years ago, we installed new windows throughout the house. Some time after, we lifted the house (yes, lifted the entire house) in order to put in a basement. (Replacing the rocks and dirt the house had previously sat on.) Needless to say, the lifting and putting down of the house left many things askew - including one of our bedroom windows upstairs.

Years went by and we involved ourselves on many another project, leaving the window askew. But once we started this bathroom remodel, we discovered that water was leaking in through this window, running down, and leaking into the bathroom below.

So, (and forgive me if I've written this before) Mike took the window out and re-installed it straight and level. The only problem? The bathroom still leaked. This time, our carpenter was taking now chances. He advised re-installing the window yet again in addition to removing and replacing the old siding. The theory was that water was entering through the poor-condition siding and, still, possibly the window.

It was a little funny. I was in the middle of getting my hair colored in the kitchen when I went upstairs for something and discovered the bedroom door closed. I opened it and to my surprise, the window was out. I leaned outside and called to the guys who were standing below, "Again?" Mike replied, "Yep. And guess what we found under the siding?"

Stink bugs! I hate stink bugs, but every year they seem to get into our bedroom. I've found them on the windows, the curtains, the walls, and even IN MY BED. Like, under the covers and I get into bed and feel one on my skin... Worst nightmare come true...

Hopefully, replacing the siding and re-re-installing the window will prevent those guys from coming in too.

By the end of that Sunday, the old siding had been replaced with new plywood and TyVek. The window was back in correctly and trimmed with ice and water. My hair was black and pink. The kids had a great time together destroying the living room and Mikey's room. (Toy explosion.) And everyone enjoyed meatballs from the crock pot at the end of a long day. Delish.

Mike and I were so excited to have the outside waterproofed at long last. Mike set to work back in the interior of the bathroom, hanging insulation and drywall, about one sheet per day.

Then, we had another rain storm. And I'm walking past the bathroom when I hear water. My heart sank as I turned on the light and found a small puddle on the floor. Mike was ready to blow a gasket. But the wind outside was howling. "Maybe some of the TyVek blew off," he suggested. And sure enough, as he crawled outside the upstairs window, (this was around 9pm mind you) he found the spot where it was likely leaking.

This is one of those homeowner moments - it's after 9pm at night and you're out on the roof in a howling wind and rain storm with a piece of ice and water, a staple gun, and a heat gun trying to fix a leak before it wrecks all your insulation and drywall.

Luckily, Mike's efforts were not in vain. The leak seemed to be fixed again. This time though, he was not as enthusiastic about completing the insulation and drywall. He decided to wait until the exterior had been re-shingled and totally water tight.

This brings us up to the present day. And yes, Mother Nature dropped another 6-9" on us just last night. But with temps up to 40 and rising, plus plentiful sunshine, we're optimistic that this Sunday may just be the day to finish all that.

I'm itching to finish this bathroom and move on to exterior-related spring projects!

Stairs, Windows, and Random Plywood

Mike was feeling much better this Sunday. And, with cabin fever setting in, and Timmy due over (haha due-over) to work on the stairs, Mike decided to get himself back to work on the kitchen window. I had some friends coming over at 2:30pm, so the guys were on a strict stop-everything a las 2:30 deadline.


Mike measured the wall and the window, allowing for new-fridge and future-corner-cabinet width. Then, we decided on the exact placement of the new window.


Next step was to create the window frame and insulate the sans-window area. Then came the difficult part. You see - our mudroom was an addition, tacked on to what used to be a cement porch. Unfortunately, when they joined the exterior mudroom wall to the exterior kitchen wall, they did not do a very good job. The two walls are at two different depths....

So... if we want to side that entire side with siding and make it look like a nice, one-piece, continuous house with no stoopid additions that weren't done correctly... We would need to build out the kitchen wall to match the depth of the mudroom wall. Build it out how? Plywood. Layers of plywood.

Lucky for us, we happened to have plywood. Plywood in the basement, plywood in the garage, plywood in the garage addition... plywood plywood everywhere! Leftover from this that or the other project.


You can see here the puzzle of plywood Mike and our neighbor Richard put together. Amazing that we just happened to have just enough to complete the job. Unfortunately, the hunt for plywood + cutting of the plywood + installation of the plywood = longer then expected. Mike was hoping to be able to install the window before the 2:30 deadline, but just couldn't make it. He papered the plywood and called it done for the day.
MEANWHILE! Timmy was hard at work on the side steps. To start, he had to pull up some of the decking to make room for the first post. The second post went down on top of the footing Mike poured last weekend.


From there, it was a simple matter of framing and decking the landing, then the first step. By the time my guests were arriving between 2:30 and 3:00, they had a step to enter on. And by the time they left around 5:30, they had a second step to exit on.



Mike will need to pour some additional concrete for the final groundish-level landing step, but all in all, I'm totally psyched about how the steps came out. Mike decided to make them nice and big - key for bringing up large items, large amounts of people, large people, and holding hands with kids down the stairs.


To finish off the kitchen wall for temporary, Mike put up tar paper. This weekend, the window goes in, do or die. And Timmy will be back on Sunday as well. It's a whole new look for the holidays!


We're so happy to be wrapping up our summer/fall projects. Winter once again will take us indoors, where the basement bathroom will be taking shape soon.

PS - Guess who couldn't resist the Home Depot black Friday appliance sale? I GOT MY FRIDGE! It's the LG model lfx28978ST.... and I saved over $800. The MSRP is $2700 .... I bought for $1899. WITH 18 months of 0% financing and a 4 year extended warranty for only $80 extra!!! Boo-Yah! Only problem is I'll have to wait until Feb 5th for delivery. Backorder.

Putting Your Footing in Your Mouth

That would be a task actually. You try fitting a 10" by 4' sonotube fulla concrete into your mouth. Ha ha. I'm feeling silly cause it's FRIDAY peepholes! I'm so excited. Can't you tell?

Last night was highly productive. TJ came over and the boys marked the footing holes. Mike and I will dig them probably tomorrow, since we have a bday party to attend tonight. And then what? Well, then we have to wait until the building inspector can do his thang and approve them, so I'm not sure what else is going to get done this weekend.

Mike assures me that there's other stuff we can do - like start re-siding the front of the house. That's going to involve taking down the old and gross siding and the old and gross shingles underneath the old and gross siding and putting up plywood. Joy.

Not that it doesn't need to get done, I just really want to start on the actual porch. I can't help it! It's beautiful out and I'm dying to stand/sit/lay on the porch.

We can't work any more on the mudroom, because I have no money for it right now. All available funds to porch! I realize that all I need to buy for the mudroom is a little bit of tile, since we already have the hardwood, but I'm putting my foot down. No spending!

See how gross the old siding is? And how stupid is that thing over the door?!

Here you can see the clearly marked footings - accurate at last.

And here's the side with the door. From this pic you can tell just how big the porch will be outside those mudroom french doors. We could never have a deck on back - so this will be absolutely awesome k possum.